9 <br />installed in advance of channel construction. Use 4” x 8’ wooden posts with <br />aluminum warning signs with Utility name and phone number, or color coded 4” x 72” fiberglass markers with Utility name and phone number. In addition, install warning signs on each isolation valve or other buried appurtenance within the Project Site. <br /> Section 5.03 PROPOSALS AND PLANS. The Utility has submitted a Final Design Submittal and a Construction Documents Submittal as detailed in Exhibit 2 The Metro Flood Diversion Authority has reviewed Exhibit 2 and provided approval of this Exhibit on <br />March 28, 2018. <br /> <br />(a) The Metro Flood Diversion Authority’s review of submittals shall be restricted <br />to a determination of whether the submittal complies with the specifications and requirements set <br />forth in this Agreement. <br /> <br />(b) The Metro Flood Diversion Authority shall complete a full review and provide <br />comments on submittals within twenty (20) Business Days of the date on which the Metro Flood Diversion Authority receives a full and complete submittal. The Utility shall notify the Metro Flood Diversion Authority when it believes a submission is full and complete. Should the Metro Flood Diversion Authority determine that a submittal is not in compliance with the <br />terms and specifications provided in this Agreement, and the Utility resubmits a previously <br />submitted submittal, the Metro Flood Diversion Authority shall review the submittal and respond within ten (10) Business Days. The Metro Flood Diversion Authority’s review of the re-submittal shall be limited to the portions of the initial submittal deemed insufficient as well as any other portions of the submittal which have been amended or added since the initial <br />submission. <br /> <br />(c) Concurrence by the Metro Flood Diversion Authority of any Final Design <br />Approval or Construction Documents Submittal will only mean the plans and specifications <br />meet the subjective standards of the Metro Flood Diversion Authority, and concurrence by the Metro Flood Diversion Authority will not be deemed to mean that the plans and specifications or construction will be structurally sound and appropriate or that the plans and specifications meet applicable regulations, laws, statutes, or local ordinances. <br /> Section 5.04 REQUIREMENT OF CONCURRENCE. No Work shall begin on the Utility Location Project to the extent the Work is within the Project Site until the Metro Flood <br />Diversion Authority concurs with the proposals, plans, and timelines required by Section 5.03 <br />hereof. Section 5.05 CONCURRENCE WITHHELD. Where concurrence is withheld, the Utility shall prepare and submit to the Metro Flood Diversion Authority a new and complete set of <br />specific plans for the Work for which concurrence was withheld no later than thirty (30) days <br />following receipt of the written notice. Section 5.06 OTHER APPROVALS. Prior to the initiation of Work on the Utility Location Project, the Utility shall provide documentation that it has applied for and obtained all