05-03-2018 Handouts
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2018
>
05-03-2018 Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 4:27:44 PM
Creation date
11/28/2018 2:36:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Project Steps Jill TownleyProject ManagerCynthia Novak-KrebsPlanning Asst.Kate FairmanPlanning DirectorRandall DoneenUnit SupervisorER TeamJaime Thibodeaux(Assessment Ecologist)Jamison Wendel (Fisheries)Rita Weaver(H&H)Suzanne Jiwani(Flood Program)Neil Haugerud(River Ecology)Mary Presnail (GIS)Jason Boyle(Dam Safety)Technical TeamBusiness officeCommunications / Design/ MediaCombined DNR SubtotalTotal Rate Charge 241,539.00$ <br />Pass Through Expenses <br />Project Manager 1.0 FTE at 75% 150,336.00$ <br />Printing and Distribution 3,000$ Mailing and Communication 1,000$ <br />Travel, lodging, meals (public mtg)1,765$ Misc. FM meeting (3 ppl. Overnight)5,150$ Meeting room rental 1,200$ Stenographer 1,000$ <br />Subtotal 163,451$ <br />TOTAL RATE PLUS PASS-THROUGH 404,990$ 10% Contingency 40,499$ TOTAL RATE PLUS CONTINGENCY 445,489$ <br />Payment Schedule
The URL can be used to link to this page
Your browser does not support the video tag.