12-01-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
12-01-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2016 9:11:20 AM
Creation date
11/28/2018 2:36:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
TECHNICAL ADVISORY GROUP RECOMMENDATION <br />2 TAG_CONTRACTINGRECOMMENDATIONFORM_WP-42A1-A3_CO-08_20161122 <br />Change Order 7 11,147.81 18,028,681.48 18,036,371.39 11‐Dec‐14 13‐Sept‐17 Sanitary Overflow Brackets, <br />ST‐4 Flared End with Grate, <br />Sluice Gate Actuator Covers <br />and 2” nuts, Updated Lot <br />Grading Plan, Milestone and <br />Project Completion Date <br />Resets, and Time Additions. <br />Change Order 8 2,386.00 18,036,371.39 18,038,757.39 11‐Dec‐14 13‐Sept‐17 Reprogramming Display and <br />Generator Building Fuel <br />Storage Area Drain <br /> <br />DISCUSSION <br />Change Order No. 8 increases the Contract Price by a total of $2,386.00 as listed below: <br />1. Reprogramming Display. The pump station’s wet well currently reads in elevation. The city’s preference is <br />to have the display read in depth to match the 2nd St. N Pump Station display for operational consistency. <br />Add $1,386.00 to the contract price to facilitate the reprogramming to depth and retest the control <br />system afterward. The Owner’s Representative and Engineer have reviewed this cost and found it to be <br />reasonable. <br />2. Generator Building Fuel Storage Area Drain. As designed, the generator building’s fuel storage area <br />consists of a poured concrete floor surrounded by three walls and no roof. Drainage concerns have been <br />identified by the engineer and two solutions considered. Changing the floor to crushed rock was not the <br />preferred alternative. A trench drain was identified as the preferred solution by the engineer and <br />approved in WCD 011. Add $1000 to the Contract Price and two days to the Generator Building Milestone <br />and Substantial Completion dates. The Owner’s Representative and Engineer have reviewed the cost and <br />time and found them to be reasonable. <br /> <br />ATTACHMENT(S): <br />Draft Change Order No. 8 <br />Reprogramming Cost Letter from ICS dated 11/4/2016 <br />Drain Price Letter from ICS dated 11/16/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.