METRO FLOOD DIVERSION PROJECT <br /> <br /> <br />TAG_CONTRACTINGRECOMMENDATIONFORM_WP-42A1-A3_CO-08_20161122 1 <br />Technical Advisory Group Recommendation Meeting Date: 11/22/2016  <br />RECOMMENDATION FOR ACTION:  <br />The Technical Advisory Group has reviewed and recommends approval of the following Contract Action(s).  <br />SUMMARY OF CONTRACTING ACTION:  <br />The Owner’s Representative has reviewed and recommends the following Contract Action(s):  <br />List description of Contract Action(s):    <br />Description <br />Budget <br />Estimate ($) <br /> <br />ICS, Inc. <br />Change Order #08 $2,386.00  <br />WP‐42A.1/A.3, 4th Street Pump Station – Reprogramming the station’s wet well display from elevation to depth.  <br />Summary of Contracting History and Current Contract Action:  <br />Original  <br />Agreement or  <br />Amendment  <br />Budget ($)  <br />Change  <br />Previous Project  <br />Cost  <br />Revised Project  <br />Cost Project Start  <br />Project  <br />Completion Comments  <br />WP‐42A.1/A.3  <br />contract  <br />17,361,616.35 0.00 17,361,616.35 11‐Dec‐14 11‐Nov‐16 Awarded 4th Street Pump  <br />Station and 2nd Street South  <br />Floodwall  <br />Change Order 1 268,555.24 17,361,616.35 17,630,171.59 11‐Dec‐14 11‐Nov‐16 Fargo Highrise parking lot  <br />modifications and other costs  <br />Change Order 2 176,462.97 17,630,171.59 17,806,634.56 11‐Dec‐14 11‐Nov‐16 Unknown underground  <br />structures and other costs  <br />Change Order 3 (10,570.93) 17,806,634.56 17,796,063.63 11‐Dec‐14 11‐Nov‐16 Deduct exterior electrical work  <br />and install fence, bollards, and  <br />lights at Fargo Highrise  <br />Change Order 4 15,174.67 17,796,063.63 17,811.238.30 11‐Dec‐14 11‐Nov‐16 Time extensions and multiple  <br />cost adjustments for Engineer‐  <br />and Owner‐directed items.  <br />Change Order 5 70,363.71 17,811,238.30 17,881,601.31 11‐Dec‐14 11‐Nov‐16 Last of suspended changes,  <br />sanitary overflow connection,  <br />T&M budget for ACM removal  <br />Change Order 6 147,079.47 17,881,601.31 18,028,681.48 11‐Dec‐14 11‐Nov‐16 Last of suspended changes,  <br />erosion blanket, still wells,  <br />unsuitable materials and  <br />additional asbestos wrapped  <br />pipe.  <br />