11-10-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
11-10-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2016 9:20:50 AM
Creation date
11/28/2018 2:36:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Recommended Contracting Actions Summary <br />00.00 Recommended_Contracting_Actions_Summary_2016_1110.docx 2 <br />Description Company Budget <br />Estimate ($) <br />Construction Change Orders <br />6.a.6 WP-42A.2, 2nd Street North Pump Station <br />Change Order 11 <br />• Final Project Cost Adjustment <br />• Decorative Fence De-Scope <br />Industrial Builders, <br />Inc. <br />-36,492.02 <br />6.a.7 WP-42H.2, El Zagal Area Flood Risk Mgmt-Phase 2 <br />Change Order 04 <br />• Additional Stop Sign <br />• Milestone Adjustment for Final Seeding <br />Reiner Contracting, <br />Inc. <br />420.50 <br />6.a.8 WP-42I.1, Mickelson Levee Extension <br />Change Order 03 <br />• Final Cost Adjustment <br />• Asphalt Millings <br />• Final Completion Seeding Adjustment <br />Industrial Builders, <br />Inc. <br />7,891.50 <br />6.a.9 WP-42F.1S Flood Control – 2nd St. N. (South of Pump <br />Station) - Change Order 14 <br />• Streetlight Modifications <br />• City of Fargo Library Landscaping <br />• Epoxy Paint for streets <br />• Differing Site Conditions material disposal <br />• 3rd Street Lighting Modifications <br />• 1st Ave Plaza Bench Modifications <br />• Topsoil Import <br />• Temporary Straw Mulch <br />Industrial Builders, <br />Inc. <br />81,816.44 <br />6.a.10 WP-42F.1N Flood Control - 2nd St. N. (North of Pump <br />Station) – Change Order 04 <br />• 8” Plaza Concrete <br />• Pull Boxes <br />• Temporary Straw Mulch <br />• Milestone Changes <br />Industrial Builders, <br />Inc. <br />9,158.00 <br />Total Construction Change Orders 62,794.42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.