11-10-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
11-10-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2016 9:20:50 AM
Creation date
11/28/2018 2:36:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
TECHNICAL ADVISORY GROUP RECOMMENDATION <br />2 TAG_CONTRACTINGRECOMMENDATIONFORM_WP-42I1_IBI_CO-03 <br />Contractor in their respective monthly pay apps, but is included in Change Order 03 to document the final <br />Contract Price. There is no schedule impact associated with this change item. <br />2.Asphalt Millings – While North Terrace was being prepared for pavement, it was decided by HMG/City of <br />Fargo personnel that an additional 45 linear feet of the road should be milled to allow for a uniform <br />driving surface between the two removal areas that were associated with the project. The total cost of <br />this change item is $1,840.00. There is no schedule impact associated with this change item. <br />3.Final Completion Seeding Adjustment – Seeding for the project has not been sufficiently established and <br />is not expected to be established by the time freeze-up occurs. CH2M recommends extending the Final <br />Completion for this work to ensure the Contractor remains responsible for achieving proper grass <br />establishment. The new Final Completion date is June 1, 2016. This is a no cost change to the Contract <br />Times. <br />ATTACHMENT(S): <br />1.Change Order No. 3 <br />2.Contractor’s Change Proposal Dated 9/30/2016 <br />Submitted by: <br />John Glatzmaier, P.E. <br />CH2M HILL <br />Project Manager <br />Metro Flood Diversion Project <br />Date <br />Keith Berndt, Cass County Administrator April Walker, Fargo City Engineer <br />Concur: Non-Concur: Concur: Non-Concur <br />Mark Bittner, Fargo Director of Engineering Jason Benson, Cass County Engineer <br />Concur: Non-Concur: Concur: Non-Concur <br />David Overbo, Clay County Engineer Robert Zimmerman, Moorhead City Engineer <br />Concur: Non-Concur: Concur: Non-Concur <br />Nathan Boerboom, Diversion Authority Project <br />Manager <br />Concur: Non-Concur: <br />November 1, 2016 <br />2-Nov-16 <br />2-Nov-16 1-Nov-16 <br />2-Nov-16 <br />2-Nov-16 <br />4-Nov-16 <br />2-Nov-16
The URL can be used to link to this page
Your browser does not support the video tag.