11-10-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
11-10-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2016 9:20:50 AM
Creation date
11/28/2018 2:36:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
TECHNICAL ADVISORY GROUP RECOMMENDATION <br />2 TAG CONTRACTING RECOMMENDATION FORM WP-42A2 IBI CO-11 <br />Change Order 9 8,672,342.63 5,486.80 8,677,829.43 9-Oct-14 7-Dec-16 Sluice Gate Operator Covers <br />Change Order 10 5,677,829.43 42,312.57 8,720,142.00 9-Oct-14 7-Dec-16 Decorative Fence Modifations and <br />Differing Subsurface Conditions - <br />removals <br />Change Order 11 8,677,829.43 (36,492.02) 8,683,649.98 9-Oct-14 7-Dec-16 Final Project Cost Adjustment and <br />Decorative Fence De-Scope <br />DISCUSSION <br />Change Order No. 11 will deduct $36,492.02 from the project cost to accommodate actual installed <br />quantities and a contract scope transfer. <br />1.Final Project Cost Adjustment: During project design/bidding the Engineer developed quantity <br />estimates for a basis of bid. This change item is an adjustment to reflect actual installed quantities <br />necessary to meet the requirements of the project. These quantities totaled a deduct of $150, which <br />has already been paid to the Contractor in the respective monthly pay app, but is included in Change <br />Order 11 to document the final Contract Price. <br />2.Decorative Fence De-Scope: The decorative fences associated with the pump station needed to be <br />revised, which was approved under 42A2 Change Order 10. The previously approved revisions have <br />resulted in a delay to the manufacturing of the fence. All other work on the 42A2 Contract is nearly <br />complete so final payment is anticipated before the end of the year. To prevent additional cost <br />associated with Contractor’s Insurance for another year, this work is to be transferred onto the 42F1S <br />contract. The same Contractor and Contractor’s Project Manager/Work Crew are working on both <br />42F1S and 42A2 so transfer of the work is not expected to be problematic. The total cost of this <br />change item is a deduct of $36,342.02, which is the exact amount that was added to the 42A.2 <br />Contract on Change Order 10. The decorative fence scope will be added to the 42F1S contract after <br />final resolution is determined between the Contractor and Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.