11-10-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
11-10-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2016 9:20:50 AM
Creation date
11/28/2018 2:36:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
METRO FLOOD DIVERSION PROJECT <br /> <br /> <br />TAG_CONTRACTINGRECOMMENDATION_DA-HMG-TO13A14_2016-1110 1 <br />Technical Advisory Group Recommendation Meeting Date: 11/02/2016 <br />RECOMMENDATION FOR ACTION: <br />The Technical Advisory Group has reviewed and recommends approval of the following Contract Action(s). <br />SUMMARY OF CONTRACTING ACTION: <br />The Owner’s Representative prepared the following Contract Action(s) for the Technical Staff team: <br />List description of Contract Action(s): <br />Houston-Moore Group, LLC <br />MFDA – Task Order 13, Amendment 14 – Levee Design and Design Support $60,000 <br /> In Town Levees, Phase 2 design closeout budget adjustment. <br /> <br />BACKGROUND: <br />Houston‐Moore Group, LLC (HMG) is the Engineer of Record for the design of the levees along the Red River (WP‐ <br />42 In‐Town Levees) and OHB Ring Levee (WP‐43), and has provided levee design and design support services <br />under Task Order 13 from November 8, 2012, to the present time. See the table below for a summary of the <br />amendments to the Task Order. <br /> <br />Summary of Contracting History and Current Contract Action: <br />Original <br />Agreement or <br />Amendment <br />Budget ($) <br />Change <br />Original <br />Project Cost <br />Revised <br />Project Cost <br />Agreement <br />Execution <br />Date <br />Project <br />Completion <br />Comments <br />Task Order 13 <br />Amendment 0 <br />‐ $425,000 ‐ 8‐Nov‐12 30‐Sep‐13 Initial authorization of 2.B.i and 2.B.ii. <br />Task Order 13 <br />Amendment 1 <br />$150,000 ‐ $575,000 13‐Dec‐12 30‐Sep‐13 Added Ring Levee Evaluations for <br />Oxbow/Hickson/Bakke; Comstock; Christine; <br />and Wolverton. Added Non‐Structural <br />Improvement Evaluation for staging area, and <br />public meeting support. <br />Task Order 13 <br />Amendment 2 <br />$4,090,000 ‐ $4,665,000 8‐Aug‐13 31‐May‐15 Added Red River Levees‐Phase 2, and VES <br />reports for WP‐43A, WP‐43C, WP‐43D, and <br />WP‐43E. Add mapping of impacted residential <br />structures in Staging Area. <br />Task Order 13 <br />Amendment 3 <br />$135,000 ‐ $4,800,000 14‐Nov‐13 30‐Sep‐14 Added landscape architecture and master <br />planning for 2nd St. corridor. Added master <br />planning svcs for Mickelson to the 4th St. levee. <br />Task Order 13 <br />Amendment 4 <br />$600,000 ‐ $5,400,000 13‐Feb‐14 30‐Sep‐14 Added 4th St. Levee Pump Station <br />Replacement. <br />Task Order 13 <br />Amendment 5 <br />$55,000 ‐ $5,455,000 8‐May‐14 30‐Sep‐14 Added laboratory testing for Red River Levees <br />– Phase 1 Design.
The URL can be used to link to this page
Your browser does not support the video tag.