Laserfiche WebLink
TECHNICAL ADVISORY GROUP RECOMMENDATION <br />TAG CONTRACTING RECOMMENDATION FORM WP-42F1S IBI CO-12 20160908.DOCX 2 <br />Original <br />Agreement or <br />Amendment <br />Previous Project <br />Cost <br />Budget ($) <br />Change <br />Revised Project <br />Cost Project Start <br />Project <br />Completion Comments <br />Change Order <br />No. 7 <br />16,616,174.40 16,378.55 16,632,552.95 08-Oct-15 22-Jul-17 Tee Manhole Addition, SS-10 <br />Manhole Revision <br />Change Order <br />No. 8 <br />16,632,552.95 257,901.37 16,890,454.32 08-Oct-15 22-Jul-17 Differing Subsurface Conditions, <br />floating castings <br />Change Order <br />No. 9 <br />16,890,454.32 (55,349.74) 16,835,104.58 08-Oct-15 22-Jul-17 Differing Subsurface Condition, Wall <br />Penetrations, CenturyLink Concrete <br />Removal, Furnish and Install Signal <br />Light Pull Boxes, City Hall <br />Construction Accommodation and <br />Misc. Items <br />Change Order <br />No. 10 <br />16,835,104.58 32,505.68 16,867,610.26 08-Oct-15 22-Jul-17 Disposal of 2B Vault, Differing <br />Subsurface Conditions – Silo Disposal <br />in Case Plaza, and Floodwall Cap <br />Modification <br />Change Order <br />No. 11 <br />16,867,610.26 52,242.85 16,919,853.11 08-Oct-15 22-Jul-17 Differing Subsurface Conditions July <br />Removals, Repair Storm Manholes, <br />Contaminated Soils Removal, Storm <br />Structure ST-8 Cover, Impressioned <br />Concrete Modifications, <br />Administrative – Accounting Change, <br />Administrative – Owner’s Rep and <br />Engineer Roles and Responsibilities <br />Change <br />Change Order <br />No. 12 <br />16,919,853.11 77,641.54 16,997,494.65 08-Oct-15 22-Jul-17 Differing subsurface conditions and <br />water main pipe bursting <br /> <br />DISCUSSION <br />Change Order No. 12 adds new and modifies existing scope elements to total an increase of $77,641.54 to the <br />Contract Price. The Change Order consists of the following items: <br />1. Differing subsurface conditions – Continued removal of unsuitable subsurface materials and debris. <br />HMG reviewed Contractor’s documentation and found the cost of $75,196.30 to be acceptable. There <br />is no schedule change associated with this change item. <br /> <br />2. Pipe bursting – Existing water main at the intersection of 1st Ave N and 3rd St N was to be removed <br />and replaced through an open trench. Contractor encountered previously unknown conflicts with a <br />concrete-encased Centurylink duct bank running north/south in the intersection. Contractor, HMG, <br />and City of Fargo evaluated the situation together and determined that removal and replacement by <br />pipe bursting would be the least-cost method of accommodating the differing subsurface condition. <br />The net change in Contract Price is an increase of $2,445.24 based on 42 linear feet of pipe installed <br />by the bursting method instead of open trench. This amount is the result of adding 42 linear feet <br />under new bid item 0246, Pipe Bursting 1st Ave N and 3rd St N for an increase of $10,215.24, and <br />deleting 42 LF under existing bid item 0051, F&I Watermain Pipe w/GB C900 DR 18 – 8” dia PVC for a <br />decrease of $7,770.00. <br /> <br />HMG reviewed the proposed price for pipe bursting and found it acceptable. HMG also calculated the <br />quantity to be deducted, and the resulting deduct amount is based on the awarded unit rate. There is <br />no schedule change associated with this change item.