Laserfiche WebLink
METRO FLOOD DIVERSION PROJECT <br /> <br /> <br />TAG CONTRACTING RECOMMENDATION FORM WP-42F1S IBI CO-12 20160908.DOCX 1 <br />Technical Advisory Group Recommendation Meeting Date: 8/31/2016 <br />RECOMMENDATION FOR ACTION: <br />The Technical Advisory Group has reviewed and recommends approval of the following Contract Action(s). <br />SUMMARY OF CONTRACTING ACTION: <br />The Owner’s Representative has reviewed and recommends the following Contract Action(s): <br />List description of Contract Action(s): <br />Description Budget <br />Estimate ($) <br /> <br />WP-42F.1S: Industrial Builders Inc. <br />Change Order #12 $77,641.54 <br />• WP-42F.1S, 2nd Street North (South of Pump Station) – Differing subsurface conditions and water main pipe <br />bursting <br /> <br />Summary of Contracting History and Current Contract Action: <br />Original <br />Agreement or <br />Amendment <br />Previous Project <br />Cost <br />Budget ($) <br />Change <br />Revised Project <br />Cost Project Start <br />Project <br />Completion Comments <br />Original <br />Contract <br />0.00 <br /> <br />0.00 16,184,905.85 08-Oct-15 15-Jun-17 Contract Award recommended to <br />lowest responsive bidder, Industrial <br />Builders, Inc. <br />Change Order <br />No. 1 <br />16,184,905.85 0.00 16,184,905.85 08-Oct-15 15-Jul-17 Adds 30 days to the Contract Time, <br />revises Interim Milestone A work <br />items, and adds an option for <br />descoping a portion of the Work <br />Change Order <br />No. 2 <br />16,184,905.85 169,490.20 16,354,396.05 08-Oct-15 15-Jul-17 Incorporates Work revisions to allow <br />work around utility lines <br />Change Order <br />No. 3 <br />16,354,396.05 96,806.17 16,451,202.22 08-Oct-15 15-Jul-17 Water main, traffic poles, traffic <br />control plan, Milestone A scope <br />Change Order <br />No. 4 <br />16,451,202.22 6,985.96 16,458,188.18 08-Oct-15 15-Jul-17 Bridge Lighting, concrete disposal, <br />winter traffic control, extend 4th St <br />signal mods requirement <br />Change Order <br />No. 5 <br />16,458,188.18 68,743.01 16,526,931.19 08-Oct-15 15-Jul-17 Concrete grading within pump <br />station, Unit price change, additional <br />H Pile, bridge abutment seal, traffic <br />signals, bridge abutment concrete <br />disposal and floodwall connections. <br />Change Order <br />No. 6 <br />16,526,931.19 89,243.21 16,616,174.40 08-Oct-15 15-Jul-17 10 Feet of additional flood wall, <br />incentive and disincentive changes <br />to the Agreement.