METRO FLOOD DIVERSION PROJECT <br />TAG CONTRACTING RECOMMENDATION FORM WP-42A2 IBI CO-10 1 <br />Technical Advisory Group Recommendation Meeting Date: 8/16/2016 <br />RECOMMENDATION FOR ACTION: <br />The Technical Advisory Group has reviewed and recommends approval of the following Contract Action(s). <br />SUMMARY OF CONTRACTING ACTION: <br />The Owner’s Representative has reviewed and recommends the following Contract Action(s): <br />List description of Contract Action(s): <br />Description <br />Budget <br />Estimate ($) <br />Industrial Builders, Inc. <br />Change Order #10 $42,312.57 <br />WP-42A.2, 2nd Street North Pump Station – Decorative Fence Modifations and Differing <br />Subsurface Conditions - removals <br />Summary of Contracting History and Current Contract Action: <br />Original <br />Agreement or <br />Amendment <br />Budget ($) <br />Change <br />Previous Project <br />Cost <br />Revised Project <br />Cost Project Start Project <br />Completion Comments <br />Original <br />Contract <br />8,069,000.00 0.00 8,069,000.00 9-Oct-14 31-Jan-16 Contract Award recommended to <br />lowest responsive bidder, Industrial <br />Builders, Inc. <br />Change Order 1 66,920.00 8,069,000.00 8,135,920.00 9-Oct-14 31-Jan-16 Revisions to traffic control <br />Change Order 2 67,397.00 8,135,920.00 8,203,317.00 9-Oct-14 31-Jan-16 Accommodate unforeseen <br />subsurface conditions (remove <br />concrete structure and dispose of <br />contaminated soil) <br />Change Order 3 225,056.00 8,203,317.00 8,428,373.00 9-Oct-14 16-Feb-16 Change in design requirements for <br />backfill of structure <br />Change Order 4 238,871.75 8,428,373.00 8,667,244.75 9-Oct-14 25-Apr-16 Baffle wall, sheeting, and 2nd Street <br />road closure <br />Change Order 5 7,614.93 8,667,244.75 8,674,859.68 9-Oct-14 25-Apr-16 Physical model tests, vacuum line, <br />pump station veneer, and cold <br />weather construction costs. <br />Change Order 6 43,488.99 8,674,859.68 8,718,348.67 9-Oct-14 7-Dec-16 Completion Milestone Changes, <br />Extended Warranty Duration, <br />Modifications to Trash Rack and <br />Rake, and Check Valve Replacement. <br />Change Order 7 1,870.32 8,718,348.67 8,720,218.99 9-Oct1-14 7-Dec-16 Pump Station Beacons <br />Change Order 8 (47,876.36) 8,720,218.99 8,672,342.63 9-Oct-14 7-Dec-16 Deduct unused budget for hazardous <br />material removal