08-25-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
08-25-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 10:46:19 AM
Creation date
11/28/2018 2:36:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Recommended_Contracting_Actions_Summary_2016-0825 1 <br />Recommended Contracting Actions Summary <br />Date: August 25, 2016 <br />Description Company Budget <br />Estimate ($) <br />Construction Change Orders <br />7.a.1 WP-42A2 (2nd Street North Pump Station), <br />Change Order 10 <br />•Decorative Fence Modifications, <br />•Differing Subsurface Conditions - Removals <br />Industrial Builders, <br />Inc. <br />42,312.57 <br />7.a.2 WP-42F1S (Flood Control – 2nd St. N, South of Pump <br />Station), Change Order 11 <br />•Differing Subsurface Conditions - July Removals, <br />•Repair Existing Storm Manholes, <br />•Contaminated Soils Removal, <br />•Storm Structure ST-8 Cover Modification, <br />•Impressioned Concrete Addition, <br />•Administrative – Bid Item Accounting Correction, <br />•Administrative – Update Owner’s Rep and Engineer Roles and <br />Responsibilities <br />Industrial Builders, <br />Inc. <br />52,242.85
The URL can be used to link to this page
Your browser does not support the video tag.