Laserfiche WebLink
TECHNICAL ADVISORY GROUP RECOMMENDATION <br />TAG CONTRACTING RECOMMENDATION FORM WP-42F1S IBI CO-11 20160816 2 <br />Original <br />Agreement or <br />Amendment <br />Budget ($) <br />Change <br />Original Project <br />Cost <br />Revised Project <br />Cost Project Start <br />Project <br />Completion Comments <br />Change Order <br />No. 6 <br />89,243.21 16,526,931.19 16,616,174.40 08-Oct-15 15-Jul-17 10 Feet of additional flood wall, <br />incentive and disincentive changes <br />to the Agreement. <br />Change Order <br />No. 7 <br />16,378.55 16,616,174.40 16,632,552.95 08-Oct-15 25-Jul-17 Tee Manhole Addition, SS-10 <br />Manhole Revision <br />Change Order <br />No. 8 <br />257,901.37 16,632,552.95 16,890,454.32 08-Oct-15 25-Jul-17 Differing Subsurface Conditions, <br />floating castings <br />Change Order <br />No. 9 <br />(55,349.74) 16,890,454.32 16,835,104.58 08-Oct-15 25-Jul-17 Differing Subsurface Condition, Wall <br />Penetrations, CenturyLink Concrete <br />Removal, Furnish and Install Signal <br />Light Pull Boxes, City Hall <br />Construction Accommodation and <br />Misc. Items <br />Change Order <br />No. 10 <br />32,505.68 16,835,104.58 16,867,610.26 08-Oct-15 25-Jul-17 Disposal of 2B Vault, Differing <br />Subsurface Conditions – Silo Disposal <br />in Case Plaza, and Floodwall Cap <br />Modification <br />Change Order <br />No. 11 <br />52,242.85 16,867,610.26 16,919,853.11 08-Oct-15 25-Jul-17 Differing Subsurface Conditions July <br />Removals, Repair Storm Manholes, <br />Contaminated Soils Removal, Storm <br />Structure ST-8 Cover, Impressioned <br />Concrete Modifications, <br />Administrative – Accounting Change, <br />Administrative – Owner’s Rep and <br />Engineer Roles and Responsibilities <br />Change <br /> <br />DISCUSSION <br />Change Order No. 11 adds new and modifies existing scope elements to total an increase of $52,242.85 to the <br />Contract Price. The Change Order consists of the following items: <br />1. Differing Subsurface Conditions – July Removals – During excavation for floodwall footings, the <br />Contractor has continued to encounter structurally unsuitable soils, that cannot be used on-site. <br />During the month of July the Contractor encountered additional unsuitable soils. This change item <br />includes labor and equipment costs for the removal of unsuitable soils during the month of July and <br />adds $35,818.25 to the Contract cost (This was reduced from the Contractor’s change proposal of <br />$36,329.30 to accommodate the Administrative Change in Item 6 below). There is no schedule change <br />associated with this change item. <br /> <br />2. Repair Storm Manholes – While conducting work on-site it was noticed that two existing storm <br />sewers near the project work needed repair. The City of Fargo requested that these storm sewer <br />manholes be repaired as part of the 42F.1S Contract to reduce future maintenance concerns <br />associated with these manholes. This work was not previously scoped under the Contract. The total <br />cost for this change item is $12,913.20. This cost includes materials and labor for fixing one storm <br />manhole and removing another storm manhole. <br /> <br />3. Contaminated Soils Removal – Add lump sum bid item 0243 Contaminated Soil Removal for $200,000 <br />to accommodate removing contaminated soil on a time and materials basis. The level of <br />contamination of the soil in the Case Plaza and MidAmerica lots for bid item 0199 Removal of