Laserfiche WebLink
METRO FLOOD DIVERSION PROJECT <br />TAG CONTRACTING RECOMMENDATION FORM WP-42F1S IBI CO-11 20160816 1 <br />Technical Advisory Group Recommendation Meeting Date: 8/1ϳ/2016 <br />RECOMMENDATION FOR ACTION: <br />The Technical Advisory Group has reviewed and recommends approval of the following Contract Action(s). <br />SUMMARY OF CONTRACTING ACTION: <br />The Owner’s Representative has reviewed and recommends the following Contract Action(s): <br />List description of Contract Action(s): <br />Description <br />Budget <br />Estimate ($) <br />WP-42F.1S: Industrial Builders Inc. <br />Change Order #11 $52,242.85 <br />•WP-42F.1S, 2nd Street North (South of Pump Station) – Differing Subsurface Conditions July Removals, <br />Repair Storm Manholes, Contaminated Soils Removal, Storm Structure ST-8 Cover, Impressioned Concrete <br />Modifications, Administrative – Accounting Change, Administrative – Owner’s Rep and Engineer Roles and <br />Responsibilities Change <br />Summary of Contracting History and Current Contract Action: <br />Original <br />Agreement or <br />Amendment <br />Budget ($) <br />Change <br />Original Project <br />Cost <br />Revised Project <br />Cost Project Start <br />Project <br />Completion Comments <br />Original <br />Contract <br />$0.00 $16,184,905.85 $16,184,905.85 08-Oct-15 15-Jun-17 Contract Award recommended to <br />lowest responsive bidder, Industrial <br />Builders, Inc. <br />Change Order <br />No. 1 <br />$0.00 $16,184,905.85 $16,184,905.85 08-Oct-15 15-Jul-17 Adds 30 days to the Contract Time, <br />revises Interim Milestone A work <br />items, and adds an option for <br />descoping a portion of the Work <br />Change Order <br />No. 2 <br />$169,490.20 $16,184,905.85 $16,354,396.05 08-Oct-15 15-Jul-17 Incorporates Work revisions to allow <br />work around utility lines <br />Change Order <br />No. 3 <br />$96,806.17 $16,354,396.05 $16,451,202.22 08-Oct-15 15-Jul-17 Water main, traffic poles, traffic <br />control plan, Milestone A scope <br />Change Order <br />No. 4 <br />$6,985.96 $16,451,202.22 $16,458,188.18 08-Oct-15 15-Jul-17 Bridge Lighting, concrete disposal, <br />winter traffic control, extend 4th St <br />signal mods requirement <br />Change Order <br />No. 5 <br />$68,743.01 $16,458,188.18 $16,526,931.19 08-Oct-15 15-Jul-17 Concrete grading within pump <br />station, Unit price change, additional <br />H Pile, bridge abutment seal, traffic <br />signals, bridge abutment concrete <br />disposal and floodwall connections.