08-11-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
08-11-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2016 8:49:20 AM
Creation date
11/28/2018 2:36:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />HMG_TO-01-A9_Long 3 <br />4.1. Provide project record GIS final design submittals for completed work <br />packages. Submittals include GIS files for completd WP-42 (In-Town Levees) <br />designs, WP-43 (Oxbow-Hickson-Bakke Ring Levee) designs, and Diversion <br />Bridge Channel designs (WP-02 CR-31 Bridge, WP-04 I-29 and Hwy 81 Bridges, <br />WP-07 CR-32 and CR-22 Bridges.. <br />Deliverables <br />i. Prepare and submit project controls budget and schedule updates for monthly reports, <br />and monthly invoices. <br />i.ii. GIS final design submittals. <br />C. On-Call Services: Respond to requests for services from PMC for tasks not included in defined <br />scopes. Requests will be provided by PMC in writing. Work will not be performed by Engineer <br />without authorization by PMC or Owner. <br />Deliverables <br />i. On-call service deliverables as requested. <br />D. Insurance: Provide $5M in project specific insurance as a project cost ($5M of project specific <br />insurance is to be provided at Engineer’s expense) for 2012, 2013, 2014, 2015, and 2016. <br />Deliverables <br />i. Insurance Certificates naming the Diversion Board of Authority, Fargo, ND; City of Fargo, <br />ND; Cass County, Fargo, ND; Cass County Joint Water Resource District, West Fargo, ND; <br />City of Moorhead, MN; Clay County, Moorhead, MN; Buffalo-Red River Watershed <br />District, Barnesville MN; North Dakota State Water Commission, Bismarck, ND; and <br />CH2M HILL as additional insureds. <br />3. Owner's Responsibilities <br />Owner shall have those responsibilities set forth in Article 2 and in Exhibit B. <br />4. Times for Rendering Services <br />Phase Start Time Completion Time <br />All Work March 8, 2012 December 31, 2016 <br /> <br />5. Payments to Engineer <br />A. Owner shall pay Engineer for services rendered as follows: <br />i. Compensation for services identified under Subtasks A through D shall be on a Time and <br />Material basis in accordance with the Standard Hourly Rates shown in Appendix 2 of <br />Exhibit C of the Agreement. <br />ii. The total compensation for services identified under the Task Order for Subtasks A <br />through D is not-to-exceed amount as defined in the table below. <br />iii. Estimated budget for Subtask A.ii, Public Involvement Assistance, and Subtask C, On-Call <br />Services, is based on an allowance. <br />1. Engineer will notify Owner when eighty percent (80%) of the budget on <br />Subtask A.ii, Public Involvement Assistance, and Subtask C, On-Call Services, is <br />expended. DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.