08-11-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
08-11-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2016 8:49:20 AM
Creation date
11/28/2018 2:36:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />00-Recommended_Contracting_Actions_Summary_2016-0811.docx 2 <br />Description Company Budget <br />Estimate ($) <br />Construction Change Orders <br />6.a.7 WP-42A1A3 (4th Street Pump Station), <br />Change Order 04 <br />• Reconcile change items that were suspended during box culvert <br />negotiations, including time extensions and multiple small cost <br />adjustments for Engineer- and Owner-directed items. <br />ICS, Inc. 15,174.67 <br />6.a.8 WP-42A2 (2nd Street North Pump Station), <br />Change Order 09 <br />• Sluice Gate Operator Covers <br />Industrial Builders, <br />Inc. <br />5,486.80 <br />6.a.9 WP-42F1N 2nd Street North (North of Pump Station), <br />Change Order 01 <br />• Watermain Insulation Change and Floodwall Cap Modification <br />Industrial Builders, <br />Inc. <br />8,122.00 <br />6.a.10 WP-42F1S (Flood Control – 2nd St. N, South of Pump <br />Station), Change Order 10 <br />• Disposal of 2B Vault, Differing Subsurface Conditions – Silo <br />Disposal in Case Plaza, and Floodwall Cap Modification <br />Industrial Builders, <br />Inc. <br />32,505.68 <br />6.a.11 WP-42H2 (El Zagal Area Flood Risk Mgmt-Phase 2), <br />Change Order 02 <br />• Plugged sanitary gravity line, tree removal, storm manhole <br />repair, standby time due to lift station/forcemain problem. <br />Reiner Contracting <br />Inc. <br />34,568.20 <br />6.a.12 WP-42I1 (Mickelson Levee Extension), <br />Change Order 02 <br />• Scope and budget for removal of concrete swimming pool at 16 <br />North Terrace, additional asbestos abatement. <br />Industrial Builders, <br />Inc. <br />6,079.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.