Laserfiche WebLink
<br />DA_CH2M_TO07-A0_CMServices 4 <br />4) Prior to acceptance or graduated acceptance of a project feature construction contract, <br />coordinate a pre-final inspection to verify the contract requirements have been met and <br />the design intent is represented in the completed construction. <br />F. Professional Services Contracts <br />1) Administer Owner’s contracts with materials testing and inspection firms including <br />Braun Intertec and Terracon. Monitor performance, schedule, and budget, and prepare <br />contracts, and contract management recommendations to the Owner as appropriate. <br />2) Administer Owner’s contracts with Engineer for engineering Services During <br />Construction on construction projects for which Engineer is the Designer of <br />Record (DOR). Manage Engineer’s activities related to technical inspections, review and <br />response to project documentation (submittals, RFIs, etc.), and other Quality Assurance <br />and project execution services. Monitor performance, schedule, and budget, and <br />prepare contract management recommendations to the Owner as appropriate. <br />G. General <br />1) Attend Owner’s twice-monthly Board Meetings to report on progress and activities, and <br />provide or present informational materials, as requested by Owner. <br />2) Prepare periodic reports or other information for Owner to present to the Diversion <br />Authority Board and its committees. <br />3) Coordinate with legal counsel, including Ohnstad Twichell, P.C. and Erik R. Johnson & <br />Associates. <br />H. On-Call Services <br />1) Respond to requests for services from Owner for tasks not included above. Services will <br />be provided only with written authorization from Owner. <br />2) Deliverables: <br />a. On-call services deliverables as requested. <br />Deliverables and Schedule: The above scope requires the following regular deliverables: <br />Task Deliverable Transmit To When <br />CM Project Construction <br />Management Plan <br />Owner, Engineer, USACE Once, by start of field <br />work <br />QA Quality Assurance Plan <br />(included in CMP) <br />Owner, Engineer, USACE Once, by start of field <br />work <br />CM Project Monthly Progress <br />Report <br />Owner, Engineer, USACE Monthly, before second <br />Thu of next month <br />General Monthly Status Report Owner Monthly, by end of third <br />week of following month <br />CM Project Final Construction <br />Report <br />Owner, Engineer, USACE Once, within 1 month of <br />contract close-out <br />QA Final record of QA data Owner, Engineer, USACE Once, within 2 months of <br />contract close-out <br />3. Owner's Responsibilities <br />Owner shall have those responsibilities set forth in Article 2 and in Exhibit B. DRAFT