05-12-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
05-12-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 9:12:59 AM
Creation date
11/28/2018 2:35:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />WP‐42C1_Change Order 01_20160505_draft Page 1 of 2 <br /> Change Order No. 01 <br />Date of Issuance: 5/12/2016 Effective Date: 5/12/2016 <br />Owner: Metro Flood Diversion Authority Owner's Contract No.: WP‐42C.1 <br />Owner’s <br />Representative: CH2M HILL Engineers, Inc. <br />Owner’s Representative <br />Project No.: 479407 <br />Contractor: Landwehr Construction, Inc. Contractor’s Project No.: <br />Engineer: Houston‐Moore Group, LLC Work Package No.: WP‐42C.1 <br />Project: Fargo‐Moorhead Area Diversion Contract Name: <br />Demolition – Howard Johnson Hotel, Old <br />Shakey’s Pizza, Fargo Public Schools <br />The Contract is modified as follows upon execution of this Change Order: <br />Description: <br />ABATE ADDITIONAL ASBESTOS CONTAINING MATERIAL <br />a. Increase Contract Price by $138,613.57 for abatement of previously unknown asbestos <br />containing materials by adding line item 8, Additional Asbestos Abatement as shown in <br />attached Change Order 1 Unit Price Schedule dated 5/12/16. <br />b. Increase Contract Times by 47 days for the Howard Johnson Hotel. Substantial <br />Completion for the hotel is changed from May 30, 2016 to July 16, 2016. Readiness for <br />final payment is change from June 13, 2016 to July 30, 2016. <br />c. Substantial Completion for Old Shakey’s Pizza and Fargo Public Schools remains at May <br />30, 2016. <br />Attachments: <br /> Change Order 1 Unit Price Schedule dated 5/12/16 <br /> DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.