Laserfiche WebLink
TECHNICAL STAFF RECOMMENDATION <br />2 TAG CONTRACTING RECOMMENDATION_MFDA-HMG-AWD0058_20160504 <br />DISCUSSION:  <br />WP‐42F.1N (Flood Control, 2nd St. N, North of Pump Station):  <br />Construction for WP‐42F.1N is scheduled to start in May 2016, and this AWD adds the SDC scope and budget for  <br />this work.  Attached is HMG’s cost proposal for this work.  This cost is shown in the WP‐42 SDB and SDC budget  <br />table summary below.  <br />  <br />WP‐42F.2:  <br />This AWD authorizes scope and budget for SDB for WP‐42F.2, which will go to bid in May 2016.  HMG’s proposal  <br />for this work is attached, and the cost is shown in the budget table below.  <br />  <br />WP‐42 SDB and SDC Budgets by Work Package and Amendment:  <br />Work Package Act. ID SDB ($) SDC ($) PM ($) On Call ($) Total ($) Amendment  <br />WP‐42A.2 &  <br />42A.1/A3 CN‐XXXX 50,000 1,300,000 180,000 20,000 1,550,000 TO17‐A0   <br />WP‐42F.1S CN‐XXXX 36,000 540,000 60,000   636,000  <br />TO17‐A1   <br />WP‐42H.2 CN‐XXXX 27,000         27,000  <br />WP‐42I.1 CN‐XXXX 15,000         15,000  <br />WP‐42C.2 CN‐XXXX 15,000         15,000  <br />Subtotal TO17‐A1   93,000 540,000 60,000 0 693,000  <br />WP‐42A.2 CN‐XXXX   192,000      192,000  <br />TO17‐A2   <br />WP42A.1/A3 CN‐XXXX   830,000 28,000   858,000  <br />WP‐42C.1 CN‐XXXX 10,000 22,000 3,000   35,000  <br />WP‐42C.2 CN‐XXXX   40,000      40,000  <br />WP‐42H.2 CN‐XXXX   263,000 38,000   301,000  <br />WP‐42I.1 CN‐XXXX 132,000 25,000   157,000  <br />WP‐42F.1N CN‐XXXX 22,000         22,000  <br />Subtotal TO17‐A2   32,000 1,479,000 94,000 0 1,605,000  <br />WP‐42F.1N CN‐XXXX 0 30,000 0 30,000  <br />AWD‐0058 WP‐42F.2 CN‐XXXX 15,000  0  0 0 15,000  <br />Subtotal AWD‐0058   15,000  30,000 0 0 45,000  <br />       <br />  <br />The PMC reviewed HMG’s revised cost proposals and found it to be acceptable.  <br />This change amount of $45,000 is included in the FY‐2016 FMDA budget.  <br />ATTACHMENT(S):  <br />1. Draft AWD‐0058  <br />