05-12-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
05-12-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 9:12:59 AM
Creation date
11/28/2018 2:35:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
METRO FLOOD DIVERSION PROJECT <br />TAG CONTRACTING RECOMMENDATION_MFDA-HMG-AWD0058_20160504 1 <br />Technical Staff Recommendation Meeting Date: 5/4/2016 <br />RECOMMENDATION FOR ACTION: <br />The Technical Staff have reviewed and recommends approval of the following Contract Action(s). <br />SUMMARY OF CONTRACTING ACTION: <br />The Owner’s Representative prepared the following Contract Action(s) for the Technical Staff team: <br />List description of Contract Action(s): <br />Houston-Moore Group, LLC <br />MFDA – AWD-0058 - WP-42 SDC $45,000 <br />Add WP‐42F.1N, Flood Control, 2nd St. N, North of Pump Station – SDC <br />Add WP‐42F.2 ‐ SDB <br /> <br />BACKGROUND: <br />Houston‐Moore Group, LLC (HMG) is the Engineer of Record for the In‐Town Levees (WP‐42), and has provided <br />Services During Bid (SDB) and Services During Construction (SDC) for WP‐42 from July 10, 2014, to the present <br />time. An amendment to Task Order 17 for these services is currently being negotiated but will not be completed <br />prior to the start of these construction projects. <br />Task Order 17, Amendment 0, included SDB and SDC for WP‐42A.1 and A.3 (4th St. Pump Station and 2nd St. So. <br />Floodwall), and WP‐42A.2 (2nd St. Pump Station). On July 10, 2015, Amendment 1 authorized SDB/SDC for WP‐ <br />42F.1S (Flood Control, 2nd Street North, South of Pump Station) and SDB for WP‐42H.2(El Zagal Area Flood Risk <br />Management – Phase 2), WP‐42I (Mickelson Levee Extension), and WP‐42C.2 (Park East Demolition). Amendment <br />3 incorporated work authorized under AWD‐00052 (WP‐42C.1, HoJo, Old Shakey’s, FPS – SDB; and WP‐42C.2, Park <br />East Demolition – SDC); added additional SDC period of performance and budget for both WP‐42A.2 and WP‐ <br />42A.1/A.3; added SDC scope and budget for WP‐42H.2, WP‐42I.1, and WP‐42C.1; and, added SDB for WP‐42F.1N. <br />Summary of Contracting History and Current Contract Action: <br />Original <br />Agreement or <br />Amendment <br />Budget ($) <br />Change <br />Original <br />Project Cost <br />Revised <br />Project Cost <br />Project <br />Start <br />Project <br />Completion <br />Comments <br />Task Order 17 <br />Amendment 0 <br />$ ‐ $1,550,000 $ ‐ 10‐Jul‐14 30‐Sep‐16 Initial WP‐42 SDB and SDC agreement for WP‐ <br />42A.1, WP‐42A.2, and WP42A.3. <br />Task Order 17 <br />Amendment 1 <br />$693,000 $2,243,000 10‐Jul‐14 30‐Sep‐16 Adds SDB and SDC for WP‐42F.1S; SDB for WP‐ <br />42H.2; SDB for WP‐42I; and, SDB for WP‐42C.2. <br />Task Order 17 <br />Amendment 2 <br />$1,605,000 $3,848,000 10‐Jul‐14 30‐Jun‐17 Incorporated AWD‐00052; added additional SDC <br />period of performance and budget for WP‐ <br />42A.2 and WP‐42A.1/A.3; added SDC for WP‐ <br />42H.2, WP‐42I.1, and WP‐42C.1; and, added <br />SDB for 42F.1N. <br />AWD‐0058 $45,000 12‐May‐16 31‐Jul‐17 Authorizes scope and budget for SDC for WP‐ <br />42F.1N, and SDB for WP‐42F.2.
The URL can be used to link to this page
Your browser does not support the video tag.