Laserfiche WebLink
6% <br />-6% <br />8% <br />10% <br />11% <br />13% <br />16% <br />29% <br />-46% <br />72%Estimating and scope uncertainty - Structures & Other <br />P3 Efficiency <br />Estimating and scope uncertainty - Channels <br />Contaminated soils and ground water - Channels <br />Fuel costs increase above unusual low <br />Swell factor assumption. Currently using 30% sell factor. ... <br />Unforeseen site conditions <br />Variability of Land Costs <br />Swell factor assumption. Currently using 30% sell factor. ... <br />Market premium for Labor costs due to pickup in Fargo / ... <br />Relative Importance of Risks and Opportunities Affecting Costs <br />Estimating and scope uncertainty -Structures and Other <br />Estimating and scope uncertainty -Channels <br />Contaminated soils and groundwater -Channels <br />Fuel costs increase -Channels <br />Swell factor assumption threat -Excavation <br />Unforeseen site conditions <br />Land cost variability <br />Market premium for labor costs <br />P3 Efficiency <br />Swell factor assumption opportunity -Excavation <br />26