03-31-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
03-31-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2016 4:29:28 PM
Creation date
11/28/2018 2:35:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Risk Register Example <br />ID Type Risk Description <br />ProbabilityofOccurrence <br />Most LikelyCost Impact($)Cost Basis <br />1 Threat Swell factor assumptioncurrently using 30% sell factor. Ranges stated from 20% to 40%. <br />L 30,000,000 Base estimate uses 30% swell.For risk item, usedifference from30% to 40% inswell factor =$30M. <br />2 Threat Storm event causes site shutdowns.VH 8,400,000 Assume 5 crewsworking full timeall delayed by$12,000/day. 5 crews x $12,000/day x 20days/year x 7 years = $8.4M. <br />3 Threat Unforeseen site conditions,sand lenses may exist. <br />M 15,000,000 1.5% of 60M yards =1M yards. 1M yardsx $15/yd = $15M. <br />25
The URL can be used to link to this page
Your browser does not support the video tag.