02-11-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
02-11-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2016 10:07:52 AM
Creation date
11/28/2018 2:35:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
METRO FLOOD DIVERSION PROJECT <br /> <br /> <br />TS CONTRACTING RECOMMENDATION_MFDA-HMG-TO08A12_20160202 1 <br />Technical Staff Recommendation Meeting Date: 2/2/2016 <br />RECOMMENDATION FOR ACTION: <br />The Technical Staff have reviewed and recommends approval of the following Contract Action(s). <br />SUMMARY OF CONTRACTING ACTION: <br />The Owner’s Representative prepared the following Contract Action(s) for the Technical Staff team: <br />List description of Contract Action(s): <br />HMG <br />MFDA – Task Order 8, Amendment 12 – Work-in-Kind $34,190 <br /> Add coordination activities for subtask E.VII Cemetery Assessment Team Support <br /> Add analysis for subtask E.X Baseline Streambank Erosion Evaluation <br /> Extend POP of selected subtasks to December 31, 2016 <br />BACKGROUND: <br />Houston‐Moore Group, LLC (HMG) has provided Work‐in‐Kind engineering services under Task Order 13 from <br />November 8, 2012, to the present time, and is the Engineer of Record for those services. See the table on the <br />next page for a summary of the amendments to the Task Order. <br />This amendment adds funding for subtask E.VII Cemetery Assessment Team Support, and subtask E.X Baseline <br />Streambank Evaluation. In addition, the POP for the following subtasks is extended to December 31, 2016: <br /> E. On‐Call Services <br /> E.VI MN EIS Preparation Support <br /> E.VII Cemetery Assessment Team Support <br /> E.VIII Large Structure Team Support <br /> E.IX Hydraulic Structures Aesthetics Evaluation <br /> E.X Baseline Streambank Erosion Evaluation <br /> E.XI LFC Modeling: Maple River to Diversion Inlet <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.