Laserfiche WebLink
<br />Description Company <br />Budget <br />Estimate ($) <br />Construction Contract Awards <br />WP-42H.2 El Zagal Phase 2 <br />• Recommendation of Award for constructing approximately 1,000 linear <br />feet of earthen levee and floodwall, temporary floodwall closure, <br />1 Gatewell structure, 8 residential demolitions with landscape removal, <br />Sanitary Lift Station, 550 feet of Storm Sewer, 500 feet of Sanitary <br />Sewer, and other components. <br />Reiner Contracting, <br />Inc. <br />1,515,798.64 <br />(contingent on <br />acquisition of <br />land) <br />Work Package 42C.1 In-Town Levees 2nd Street/Downtown <br />Area Demolition (HoJo’s, Shakey’s, Fargo Public Schools) <br />• Recommendation of Award for building and foundation demolition of a <br />two story hotel and attached restaurant, building and foundation <br />demolition of a 3,575 square foot office building, and partial building <br />and foundation demolition of a warehouse in downtown Fargo, North <br />Dakota. The project will also include a partial renovation to the <br />warehouse building. <br />Landwehr <br />Construction, Inc. <br />668,870.00 <br />(contingent on <br />acquisition of <br />land) <br />Work Package 42I.1 Mickelson Levee Extension <br />• Recommendation of Award for constructing an earthen levee, road <br />reconstruction, and underground utility relocation located is along <br />North Terrace North and North River Road North in Fargo, ND. <br />[TBD] [TBD] <br /> <br />Recommended_Contracting_Actions_Summary_2016-0211.docx 2