Laserfiche WebLink
TECHNICAL STAFF RECOMMENDATION <br />4 TS CONTRACTING RECOMMENDATION_MFDA-HMG-TO09A15_20160202 <br />G.  Basin‐Wide Retention Support SW‐1040 55,000 0 55,000 <br />H.  Phasing Plan Interim Modeling SW‐6140 90,000 (34,837) 55,163 <br />I.  Phase 7.1 Model Update SW‐1040 165,000 (460) 164,540 <br />J.  Update PMF Study with Revised  <br />Distribution of Snowmelt Runoff  <br />SW‐6130 116,000 (4,391) 111,609 <br />K.  Phase 8 Model Update SW‐1040 732,000350,493 1,082,493 <br />L.  Update the Balanced Hydrographs at  <br />Hickson, ND  <br />SW‐6090 167,000 (45,482) 121,518 <br />M.  Eastern Staging Area Evaluation SW‐6070 52,000 0 52,000 <br />N. Staging Area Culvert and Bridge  <br />Survey  <br />SW‐6060 153,000 (31,275) 121,725 <br />O. NDSU Ag Impacts Study Support SW‐1040 47,00027,537 74,537 <br />TOTAL 2,324,341 98,021 2,422,362 <br />The PMC reviewed HMG’s revised cost proposals and found it to be acceptable.  <br />This change amount of $98,021 is included in the FY‐2016 FMDA budget.  <br />ATTACHMENT(S):  <br />1.Draft Task Order 9, Amendment 15 <br />2.HMG Cost Proposal for K. Phase 8 Model Update <br />Presented by:  <br />John W. Glatzmaier, P.E.  <br />CH2M    <br />Project Manager  <br />Metro Flood Diversion Project  <br />Date <br />Keith Berndt, Cass County Administrator April Walker, Fargo City Engineer  <br />Concur:  Non‐Concur:Concur:Non‐Concur <br />Mark Bittner, Fargo Director of Engineering Jason Benson, Cass County Engineer  <br />Concur:  Non‐Concur:Concur:Non‐Concur <br />David Overbo, Clay County Engineer Robert Zimmerman, Moorhead City Engineer <br />Concur:Non‐Concur:Concur:  Non‐Concur <br />Nathan Boerboom, Diversion Authority Project  <br />Manager  <br />Concur:  Non‐Concur: <br />Feb 3, 2016 <br />Feb 3, 2016 <br />Feb 3, 2016 <br />Feb 3, 2016 <br />Feb 3, 2016 <br />Feb 3, 2016 <br />Feb 4, 2016