02-11-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
02-11-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2016 10:07:52 AM
Creation date
11/28/2018 2:35:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />HMG_TO08‐A12_LongHMG_TO08‐A112_Long.docx 14 <br />Subtask <br />Current <br />Budget <br />($) <br />Change <br />($) <br />Revised <br />Budget <br />($) <br /> E.V. MN EIS Scoping Document Comment <br />Support <br />15,000 ‐6,497.25 8,502.75 <br />E.VI. MN EIS Preparation Support 416,000 0 416,000.00 <br />E.VII. Cemetery Assessment Team Support 61,000 24,000.00 85,000.00 <br />E.VIII. Large Structure Team Support 50,000 0 50,000.00 <br />E.IX. Hydraulic Structures Aesthetics <br />Evaluation <br />54,000 0 54,000.00 <br />E.X. Baseline Stream Bank Erosion <br />Evaluation <br />210,000 0 210,000.00 <br />E.XI. LFC Modeling: Maple River to <br />Diversion Inlet <br />81,000 0 81,000.00 <br />TOTAL 1,478,675 0.00 1,478,675.00 <br /> <br />B. The terms of payment are set forth in Article 4 of the Agreement and in Exhibit C. <br />C. Provide Monthly Invoice and status report <br />i. Status report will accompany invoice and detail work completed during the invoice <br />period. <br />ii. Status report will be organized by subtask and provide narrative of work completed on <br />each subtask. <br />iii. Status of work completed will include: <br />1. Outstanding issues to resolve, expected steps to progress work, outstanding <br />items required from either Owner, Owner’s Representative, or others to <br />progress work, anticipated completion date of subtasks. <br />2. Dates of on‐call services provided and description of the activities performed <br />by Engineer, including any deliverables produced. <br />3. Dates of deliverables otherwise required under the Project Management task. <br />B. <br />6. Consultants: <br />A. Barr Engineering Company <br />B. HDR, Inc. <br />7. Other Modifications to Agreement: None <br />8. Attachments: None <br />9. Documents Incorporated By Reference: <br />A. AWD‐00039 REV‐0, Cemetery Berm Conceptual Designs and Rural Water Well Survey, dated <br />July 10, 2014. <br />A. <br />B. AWD‐00046 REV‐0, MN EIS Support for Additional Information Request, signed December 10, <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.