Laserfiche WebLink
  <br />HMG_TO08‐A12_LongHMG_TO08‐A112_Long.docx  13  <br />  <br />Subtask  <br />Current  <br />Budget  <br />($)  <br />Change  <br />($)  <br />Revised  <br />Budget  <br />($)  <br />A. Meander Belt Width Analyses  307,203 0  307,203.00  <br />B. Identification and Assessment of Tie‐Back  <br />Levees  <br />40,000 5,089.96  45,089.96  <br />C. EMB Openings (Allowance) 39,989 0  39,989.00  <br />D. Diversion Inlet Gates (Allowance) 55,418 0  55,418.00  <br />E. On‐Call Services ($250,000 Allowance) 100,000 ‐23,661.05 76,338.95  <br /> E.I. Maximum Project Design Flows 13,658 0  13,658.00  <br /> E.II. Local Drainage Plan 9,978 0  9,978.00  <br /> E.III. Reach 1 LFC Meander Modeling 9,693 0  9,693.00  <br /> E.IV. Geomorphology Consulting 15,736 1,068.34  16,804.34  <br />Subtask Activity ID  <br />Current  <br />Budget  <br />($)  <br />Change  <br />($)  <br />Revised  <br />Budget  <br />($)  <br />A. Meander Belt Width Analyses  SW‐1010 307,203 0  307,203.00  <br />B. Identification and Assessment of Tie‐ <br />Back Levees  <br />SW‐1040 45,089.96 0  45,089.96  <br />C. EMB Openings (Allowance) SW‐1040 39,989 0  39,989.00  <br />D. Diversion Inlet Gates (Allowance) SW‐1040 55,418 0  55,418.00  <br />E. On‐Call Services ($250,000 Allowance) SW‐1040 76,338.95 0 76,338.95  <br /> E.I. Maximum Project Design Flows SW‐6130 13,658 0  13,658.00  <br /> E.II. Local Drainage Plan SW‐1060 9,978 0  9,978.00  <br /> E.III. Reach 1 LFC Meander Modeling SW‐1010 9,693 0  9,693.00  <br /> E.IV. Geomorphology Consulting SW‐1390 16,804.34 0  16,804.34  <br /> E.V. MN EIS Scoping Document  <br />Comment Support  <br />SW‐6180 8,502.75 0  8,502.75  <br />E.VI. MN EIS Preparation Support SW‐1142 416,000 0  416,000.00  <br />E.VII. Cemetery Assessment Team  <br />Support  <br />SW‐1410 85,000 24,750  109,750.00  <br />E.VIII. Large Structure Team Support SW‐6110 50,000 0  50,000.00  <br />E.IX. Hydraulic Structures Aesthetics  <br />Evaluation  <br />SW‐6200 54,000 0  54,000.00  <br />E.X. Baseline Stream Bank Erosion  <br />Evaluation  <br />SW‐1390 210,000 9,440  219,440.00  <br />E.XI. LFC Modeling: Maple River to  <br />Diversion Inlet  <br />SW‐6170 81,000 0  81,000.00  <br />TOTAL  1,478,675 34,190  1,512,865 DR <br />A <br />F <br />T