  <br />HMG_TO08‐A12_LongHMG_TO08‐A112_Long.docx  11  <br />XI. LFC MODELING: MAPLE RIVER TO THE DIVERSION INLET  <br />1. Purpose: For the Diversion Channel between the Maple River and the Diversion  <br />Inlet Structure, determine the appropriate meandering LFC wavelength and  <br />amplitude design parameters Diversion Channel bottom widths of 200‐feet and  <br />250‐feet.    <br />2. Background:  Additional H&H modeling of flow in the Diversion Channel from  <br />the Maple River to the Diversion Inlet has shown that the current 300‐feet wide  <br />Diversion Channel can be narrow to 200‐feet and still pass the project design  <br />flows.  A narrower Diversion Channel will require revised meandering LFC  <br />design parameters.  <br />3. Scope:  <br />a. Task 1 ‐ Provide analysis of the morphodynamic stability of the  <br />meandering LFC alignment within the main Diversion Channel from  <br />the Maple structure upstream to the Diversion Inlet structure.  <br />Determine an appropriate alignment wavelength that will not tend to  <br />initiate planform widening. Determine an alignment amplitude such  <br />that the LFC planform is within the main Diversion Channel for 200‐ <br />feet and 250‐feet bottom widths and 25‐feet and 50‐feet side slope  <br />toe buffer zones. Model the recommended alignments in RVR  <br />Meander model and summarize the alignments’ stability.  <br />b. Task 2 – If authorized in writing, model the designed alignments from  <br />the Maple River downstream to Reach 1 (to be provided by USACE) in  <br />RVR Meander and summarize the alignments’ stability.  <br />4. Deliverables:   <br />a. Draft and Final Technical Memorandums summarizing the results of  <br />the analysis and modeling.  <br />b. Power Point presentation summarizing the results.  <br />  <br />3. Owner’s Responsibilities  <br />Owner shall have those responsibilities set forth in Article 2 and in Exhibit B.  <br />4. Times for Rendering Services  <br />Subtask Start Time Completion Time  <br />A. Meander Belt Width Analyses April 12, 2012 October 31, 2012 <br />B. Identification and Assessment of Tie Back Levees June 1, 2012 October 31, 2012 <br />C. EMB Openings June 1, 2012 October 15, 2012 <br />D. Diversion Inlet Gates June 1, 2012 October 31, 2012 <br />E. On‐Call Services TBD with each task December 31,  <br />2016March, 31,  <br />2016  <br /> E.I‐Maximum Project Design Flows July 16, 2012 October 31, 2012 <br /> E.II‐Local Drainage Plan September 13, 2012 October 31, 2012 <br />DR <br />A <br />F <br />T