01-14-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
01-14-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 7:55:25 AM
Creation date
11/28/2018 2:35:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Asbestos Consulting Services F-M Diversion Authority. ■ Fargo, North Dakota <br />December 23, 2015 ■ Terracon Proposal No. PM1150345 <br />Responsive ■ Resourceful ■ Reliable 6 <br /> <br />WP-42.C.1 <br />Variable Fee – Air Monitoring Tasks <br />Estimated <br />Daily Fee <br />Estimated <br />Total Fee <br />3 – Onsite Air Monitoring per event <br /> Sample collection (includes air pumps and daily supplies) <br />($65.00/each day) (estimated 7 days) <br />$65.00 $455.00 <br /> Daily adjacent sampling (estimated six canisters) (6 events) <br />o Sample analysis (shipping & analysis for independent <br />laboratory and assumes a 3-hour TAT) ($150.00/each) <br />$150.00 $2,400.00 <br />OR <br />o Sample analysis (equipment and onsite analysis) <br />($250.00/each) <br />$250.00 $4,000.00 <br /> Clearance sampling (estimated seven canisters per event) (2 <br />events) <br /> <br />o Sample analysis (shipping & analysis for independent <br />laboratory) ($175.00/each) <br />$175.00 $350.00 <br />OR <br />o Sample analysis (equipment and onsite analysis) <br />($275.00/each) <br />$275.00 $550.00 <br />Estimated Variable Fee’s $390.00 to <br />$590.00 <br />$3,205.00 <br />to <br />$5,005.00 <br /> <br />4 – Final Closeout Report $1,200.00 <br />Estimated Project Total: $13,225.00 <br />to <br />$15,025.00 <br /> <br />If additional suspect ACMs are identified during demolition, Terracon will conduct bulk sample <br />tests on a time and materials basis with the cost for each sample billed at $11.25 per sample, <br />hourly technician time, and shipping costs +15%. Please see the attached Asbestos Schedule of <br />Services and Fees. <br /> <br />Terracon will provide a Certified Industrial Hygienist (CIH) for review of submittal documents and <br />reports periodically throughout the project. This fee and any additional field service and/or project <br />management time required or services requested by CH2M Hill will be billed in accordance with <br />the attached fee schedule. <br /> <br />Terracon’s invoice will be submitted to the appropriate invoice submittal email on approximately <br />30-day billing cycles. If conditions are encountered at the property that require significant changes
The URL can be used to link to this page
Your browser does not support the video tag.