01-14-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
01-14-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 7:55:25 AM
Creation date
11/28/2018 2:35:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Asbestos Consulting Services F-M Diversion Authority. ■ Fargo, North Dakota <br />December 23, 2015 ■ Terracon Proposal No. PM1150345 <br />Responsive ■ Resourceful ■ Reliable 5 <br />WP-42.C.2 <br />Variable Fee – Air Monitoring Tasks <br />Estimated <br />Daily Fee <br />Estimated <br />Total Fee <br />3 – Onsite Air Monitoring per event <br /> Sample collection (includes air pumps and daily supplies) <br />($65.00/each day) (estimated 20 days) <br />$65.00 $1,300.00 <br /> Daily adjacent sampling (estimated six canisters) (16 events) <br />o Sample analysis (shipping & analysis for independent <br />laboratory and assumes a 3-hour TAT) ($150.00/each) <br />$150.00 $2,400.00 <br />OR <br />o Sample analysis (equipment and onsite analysis) <br />($250.00/each) <br />$250.00 $4,000.00 <br /> Clearance sampling (estimated seven canisters per event) (4 <br />events) <br /> <br />o Sample analysis (shipping & analysis for independent <br />laboratory) ($175.00/each) <br />$175.00 $700.00 <br />OR <br />o Sample analysis (equipment and onsite analysis) <br />($275.00/each) <br />$275.00 $1,100.00 <br />Estimated Variable Fee’s $390.00 to <br />$590.00 <br />$4,400.00 <br />to <br />$6,400.00 <br /> <br /> <br />4 – Final Closeout Report $1,200.00 <br />Estimated Project Total: $46,415.00 <br />to <br />$48,415.00 <br /> <br />WP-42.C.1 (Shakey’s Pizza and Howard Johnson Demolition) <br /> <br />WP-42.C.1 <br />Daily Tasks (estimated 2-weeks)1 <br />Estimated <br />Daily Fee <br />Estimated <br />Total Fee <br />1 – Asbestos Consulting (8 hours a day @ $105.00/hour) & Monitoring <br />incidental materials ($25/day) <br />$865.00 $8,400.00 <br />2 – Reporting (Weekly report – two hours@ $105.00/hour) $210.00 $420.00 <br />Estimated Daily Fees: $8,820.00 <br /> <br /> <br />1 Terracon will revise the estimated timeline based on abatement contractors submitted schedule
The URL can be used to link to this page
Your browser does not support the video tag.