12-17-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
12-17-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 9:14:21 AM
Creation date
11/28/2018 2:35:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
St. Paul District <br /> <br />December 17, 2015 <br /> <br />Since the last Diversion Authority meeting, the following project-related activities were worked on: <br /> <br />1. Minnesota EIS: Awaiting word from the DNR on assistance required for public comment <br />response and resolution. <br /> <br />2. Reach 7/Maple River Aqueduct: Flume study completed which analyzed velocity conditions <br />across aqueduct. Final report anticipated by 30 November. <br /> <br />3. Diversion Inlet Structure: Resolution of Final Technical Review (FTR) comments for this <br />gated structure in the works. Final plans and specifications anticipated in April 2016. <br /> <br />4. Optimization of Diversion Channel and Low Flow Channel: Continuing this work upstream <br />of the Maple River to the Diversion Inlet Structure. Complete this year. <br /> <br />5. Cemetery Mitigation Plan: Will address Cemetery POC comments on the Draft Plan as part <br />of DA subcommittee work to be performed after MnEIS is complete. Sent follow-up letters to all <br />Cemetery POCs on 13 August and 3 November. <br /> <br />6. In-Town Levees: Continue to support design and construction to assure features can be <br />incorporated into FMM Project. Includes ATR and IEPR reviews. <br /> <br />7. Alternate Financing/Split Delivery Plan: Assisting with development of RFP and reference <br />documents. Team attended workshop with Sponsors on 3 December. Continued <br />reporting/coordination up our chain of command. <br /> <br />8. Rights-of-Entry and Surveys: Cultural surveys and borings have been completed for this <br />season. Boring crew demobilizing this week. <br /> <br />9. Real Estate: Continue to review appraisals and support land acquisition activities. <br /> <br />10. Mitigation: Continue work to identify additional environmental mitigation sites. <br /> <br />11. Met with the NDSWC on Wednesday, December 16 to discuss the Project. <br /> <br />12. Met with the MnDNR on Friday, December 11 to discuss the dam safety permitting process. <br /> <br /> <br />Monthly Update <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.