12-17-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
12-17-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 9:14:21 AM
Creation date
11/28/2018 2:35:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />FMDA PHASE I Submittal I-1 <br />Fargo-Moorhead Diversion Authority <br />Detention Funding <br />Phase I Submittal <br /> <br />Instructions: <br />1) Complete and provide Phase I FMDA Funding Allocation Worksheet based on conceptual assumptions for dam or <br />impoundment operation to determine maximum FMDA Funding. <br />2) Provide supporting documentation detailing the development of the overall concept. <br />3) Fill out this Application Form. <br />4) Provide map illustrating the proposed dam or impoundment location and drainage area. <br />5) Provide models used to complete the Phase I FMDA Funding Allocation Worksheet. <br /> <br />Application Date: 11/25/15 <br />Project Name: Upper South Branch Water Resource Management Project <br />Project Location: (Provide Location Map) <br />HUC12 Watershed Code: 090201060523 State: Minnesota <br /> County: Wilkin Legal Description: Sec 4 & 5 T135 R46, Sec 32 & 33, T136 R46 <br /> <br />Project Sponsor: Buffalo-Red River Watershed District <br />Mailing Address: PO Box 341 Barnesville, MN 56514 <br />Phone No: (218) 354-7710 E-Mail: brrwd@bvillemn.net <br /> <br />Authorized Agent: Houston Engineering, Inc. <br />Mailing Address: 1401 21st Ave N Fargo, ND 58102 <br />Phone No: (701) 237-5065 E-Mail: ejones@houstoneng.com
The URL can be used to link to this page
Your browser does not support the video tag.