12-17-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
12-17-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 9:14:21 AM
Creation date
11/28/2018 2:35:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Recommended Contracting Actions Summary <br />Date: December 17, 2015 <br />Description Company <br />Budget <br />Estimate ($) <br />Retention Phase 1 Funding <br />Buffalo Red River Watershed District – Retention Funding: <br />Upper South Branch Water Resource Management Project, <br />Phase 1 <br />BRRWD 74,022.00 <br />Buffalo Red River Watershed District – Retention Funding: <br />Barnesville Township Water Resource Management Project, <br />Phase 1 <br />BRRWD 60,746.00 <br /> <br />Change Orders <br />WP-42.A2, Change Order No. 5 (2nd Street North Pump <br />Station) – Additional physical model test runs to <br />accommodate wet well modification design, reduction in wet <br />well vacuum line size, change in pump station veneer, and <br />costs to accommodate cold weather construction. <br />IBI 7,614.93 <br />WP-42F.1S, Change Order No. 4 (Flood Control, 2nd St N, <br />South of Pump Station) – Connect bridge lighting, dispose <br />excavated concrete, modify interim milestone A to remove <br />4th Street signaling and lighting. <br />IBI 6,985.96 <br /> <br />Authority Work Directives <br />AWD-00053 Materials Testing Services, Task Order <br />No. 1 - Perform asbestos abatement monitoring and Quality <br />Assurance services for Work Package 42C.2, Demolition of <br />Park East Apartments. <br />Terracon $32,920.00 <br />AWD-00054 Levee Design and Design Support - Provide <br />engineering services to combined WP-43 Phase B (USACE <br />Levee) with Phase D work package, including design update <br />for of a portion of the pump station and gatewell facilities. <br />HMG $100,000.00 <br /> <br />01 Recommended_Contracting_Actions_Summary_2015-1217.docx 1
The URL can be used to link to this page
Your browser does not support the video tag.