11-12-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
11-12-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 7:44:54 AM
Creation date
11/28/2018 2:35:43 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
FINAL – FMDA Detention Funding <br />Policy <br /> 9 <br />SECTION VII – Final Design Technical Criteria for Dams and Impoundments <br />The following summarizes technical requirements for eligibility for FMDA funding. The Final Design Report <br />summarizing how the following considerations are met before FMDA funds can be used for project construction. <br /> Engineering Design: Structural and hydraulic design of all dams and impoundments considered for FMDA <br />funding must be performed by a registered professional engineer of the State of Minnesota and/or North <br />Dakota, depending on project location. <br /> Hydrologic and Hydraulic Adequacy: Dams and impoundments considered for FMDA funding must be sized <br />in accordance the appropriate governing Dam Safety Rules for Minnesota or North Dakota, depending on <br />the location of the proposed project location. These factors include, but are not limited to, the following: <br />o Appropriate determination of Dam Safety Classification. <br />o Appropriate capacity principal spillway and emergency spillway components based on Dam Safety <br />Classification. <br />o Appropriate capacity principal spillway and emergency spillway components based on Dam Safety <br />Classification. <br />o Ability of the proposed dam or impoundment to provide sufficient freeboard before overtopping <br />based on Dam Safety Classification. <br />o Erosion protection for dam or impoundment earthen embankments and spillways. <br />o Adequate measures to control downstream channel erosion. <br />o Considerations for sediment yield over the project life. <br />o Site drawdown procedures for projects featuring gated storage. <br /> Structural Stability: The structural design of the proposed dams or impoundments must consider the <br />following: <br />o Gravity forces; Hydrostatic pressure; Uplift forces; Overturning moment; Resistance to sliding; Ice <br />pressures; Earthquake forces; Slope stability including consolidation and pore pressures; Seepage <br />collection or prevention; Foundation conditions including appropriate borings and determination <br />of the strength of foundation materials; Specifications for materials of construction and their <br />placement or installation; Adequate construction inspection to assure conformance with design <br />assumptions; and Adequacy of the cofferdam, if any. <br />In addition to items listed above, the FMDA reserves the right to request additional information from the Project <br />Sponsor for any other technical considerations relevant to the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.