Laserfiche WebLink
FINAL – FMDA Detention Funding  <br />Policy   <br /> 9  <br />SECTION VII – Final Design Technical Criteria for Dams and Impoundments  <br />The following summarizes technical requirements for eligibility for FMDA funding. The Final Design Report  <br />summarizing how the following considerations are met before FMDA funds can be used for project construction.   <br /> Engineering Design: Structural and hydraulic design of all dams and impoundments considered for FMDA  <br />funding must be performed by a registered professional engineer of the State of Minnesota and/or North  <br />Dakota, depending on project location.  <br /> Hydrologic and Hydraulic Adequacy: Dams and impoundments considered for FMDA funding must be sized  <br />in accordance the appropriate governing Dam Safety Rules for Minnesota or North Dakota, depending on  <br />the location of the proposed project location. These factors include, but are not limited to, the following:  <br />o Appropriate determination of Dam Safety Classification.  <br />o Appropriate capacity principal spillway and emergency spillway components based on Dam Safety  <br />Classification.  <br />o Appropriate capacity principal spillway and emergency spillway components based on Dam Safety  <br />Classification.  <br />o Ability of the proposed dam or impoundment to provide sufficient freeboard before overtopping  <br />based on Dam Safety Classification.  <br />o Erosion protection for dam or impoundment earthen embankments and spillways.  <br />o Adequate measures to control downstream channel erosion.  <br />o Considerations for sediment yield over the project life.  <br />o Site drawdown procedures for projects featuring gated storage.   <br /> Structural Stability: The structural design of the proposed dams or impoundments must consider the  <br />following:  <br />o Gravity forces; Hydrostatic pressure; Uplift forces; Overturning moment; Resistance to sliding; Ice  <br />pressures; Earthquake forces; Slope stability including consolidation and pore pressures; Seepage  <br />collection or prevention; Foundation conditions including appropriate borings and determination  <br />of the strength of foundation materials; Specifications for materials of construction and their  <br />placement or installation; Adequate construction inspection to assure conformance with design  <br />assumptions; and Adequacy of the cofferdam, if any.  <br />In addition to items listed above, the FMDA reserves the right to request additional information from the Project  <br />Sponsor for any other technical considerations relevant to the project.  <br />