Laserfiche WebLink
FARGO‐MOORHEAD DIVERSION AUTHORITY  <br />DETENTION FUNDING  <br />POLICY MANUAL  <br />  <br />  <br />FINAL  <br />(11/12/2015)  <br />  <br />  <br />TABLE OF CONTENTS  <br />INTRODUCTION          1  <br />SECTION I – General Criteria        1  <br />SECTION II – Procedures for Review and Approval      3  <br />SECTION III – Timeline for Project Implementation      4  <br />SECTION IV ‐ PHASE I Submittal – Preliminary Design     6  <br />SECTION V ‐ PHASE II Submittal ‐ Land Acquisition and/or Final Design   7  <br />SECTION VI ‐ PHASE III Submittal – Construction      8  <br />SECTION VII – Final Design Technical Criteria for Dams and Impoundments   9  <br />PHASE I SUBMITTAL FORM        I‐1  <br />PHASE II SUBMITTAL FORM        II‐1  <br />PHASE III SUBMITTAL FORM        III‐3  <br />  <br />