10-08-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
10-08-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2015 9:36:42 AM
Creation date
11/28/2018 2:35:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Recommended Contracting Actions Summary <br />Date: October 8, 2015 <br />Description Budget Estimate ($) <br />Beaver Creek Archaeology, Inc. <br />MSA and Task Order No. 1 – Amendment 0 111,000 <br />• Phase 1 Cultural Investigation (Sta. 700+00 to 1475+00) - New scope and budget <br />Landwehr Construction, Inc. <br />Contract Award 1,089,888 <br />• WP-42C.2 In-Town Levees, 2nd Street/Downtown Area - Park East Apartment <br />Demolition and removal of a 4-story apartment building, three garage buildings, <br />and pavement <br />Industrial Builders, Inc. <br />Change Order #2 169,490.20 <br />• WP-42F.1S Flood Control, 2nd St N, South of Pump Station – work revisions to <br />allow work around of fiber optic lines <br /> <br />Industrial Builders, Inc. <br />Work Change Directive #4 175,000 <br />• WP-42A.2, 2nd St North Pump Station – Authorize work revisions associated <br />with wet well modifications resulting from the physical model study <br /> <br />Enventis Telcom Inc. <br />Payment Agreement 381,909 <br />• Utility Relocation – WP-42A.1/A.3 Flood Wall Project <br />Xcel Energy <br />Payment Agreement 55,000 <br />• Utility Relocation – work to move overhead power lines to facilitate WP-42F.1S <br />2015 construction <br /> <br /> <br />Recommended_Contracting_Actions_Summary_2015-1008.docx 1
The URL can be used to link to this page
Your browser does not support the video tag.