09-10-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
09-10-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 8:37:11 AM
Creation date
11/28/2018 2:35:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />b. Deliverables include: draft report submittal to USACE/SHPOs, response <br />to comments, and final deliverables to MFDA, USACE, ND SHPO, MN <br />OSA, and MHS. <br />c. The nine (9) cemeteries are: <br />i. In Minnesota (5): Clara Cemetery, Roen Family Cemetery, <br />Wolverton Cemetery, Hoff Cemetery, and Comstock <br />Cemetery. <br />ii. In North Dakota (4): North Pleasant Church Cemetery, Lium <br />Cemetery, Lower Wild Rice and Red River Cemetery, Hemnes <br />Cemetery, and St. Benedict’s CemeteryEagle Valley <br />Evangelical Cemetery. <br />C. ON-CALL SERVICES: when specifically authorized in writing by Owner or Owner’s Project <br />Management Consultant (PMC), provide cultural resource investigations as directed. <br />I. WILD RICE RIVER DAM: Approximately 4 acres on both banks of the Wild Rice River <br />and within the construction limits area. <br />a. Conduct a Phase I cultural survey. <br />i. Conduct subsurface testing, including soil cores for the site. <br />b. Conduct a Phase II evaluation of the National Register of Historic Places <br />eligibility of the existing Wild Rice Dam. <br />c. Proposed work schedule: complete field work by May 30, 2014, submit <br />draft report June 30, 2014; thirty day North Dakota SHPO review ending <br />July 30, 2014; and final report due August 29, 2014. <br />II. EL ZAGAL PHASE 2 LEVEE: complete the Phase I cultural resources survey and <br />reporting for the El Zagal Phase 2 levee. <br />D. DELIVERABLES: <br />I. Field notes—one copy <br />II. Field report(s)—letter report <br />III. Draft contract report <br />IV. Final contract report <br /> <br />3. OWNER’S RESPONSIBILITIES <br />A. Owner shall have those responsibilities set forth in Article 2 and in EXHIBIT B of the Agreement. <br />B. Acquire Rights of Entry for properties to be investigated. <br />URS_TO-01-A03_Long.docx 5 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.