Laserfiche WebLink
<br />Preservation Commission prior to sign completion. Comply <br />with the City of Fargo’s sign code. Coordinated placement of <br />the sign with City staff. <br />c.v. Deliverables include: sketch plans, photographs, updated site <br />forms, updated NRHP nomination form, and historical marker <br />sign. Two sets of original photographs (negatives and <br />archaivally-stable prints) and associated documents shall be <br />prepared for submission to the North Dakota SHPO and the <br />Fargo Historic Preservation Commission. Two copies of these <br />documents shall be submitted to the USACE and the Owner. <br />III. REACHES 4 AND 5: Proposed Excavated Material Piles (EMPs) and construction <br />staging areas. Attachment 3 has been provided for reference only. Shapefiles will be <br />provided to Engineer prior to start of field work. <br />a. Reach 4: Approximately 71 acres of EMPs, temporary work areas, and <br />construction staging areas. <br />b. Reach 5: Approximately 112 acres of EMPs, temporary work areas, <br />construction staging areas, and temporary by-pass channels. <br />IV. WESTERN ALIGNMENT CHANGE: If directed in writing, conduct Phase I cultural <br />resources investigations on approximately 1800 acres of portions of the Diversion <br />alignment from the Maple River south to the Sheyenne River. Attachment 4 has been <br />provided for reference only. Shapefiles will be provided to Engineer prior to start of field <br />work. Conduct Phase 1 cultural resources investigations on approximately 30 acres <br />(Parcel #’s 15000012355030 and 67000012655000) on the Western Alignment and <br />provide a brief letter report on the work completed to date. Consolidate all previous <br />data (notes, photographs, and correspondence) collected for Western Alignment and <br />submit to the Owner. <br />V. SOUTHERN ALIGNMENT CHANGE: Conduct Phase I cultural resources investigations <br />on approximately 6,062 acres of the southern alignment, including the southern <br />embankment, Wild Rice River control structure, Red River control structure, North <br />Dakota tie-back levee, Minnesota tie-back levee, and the I-29 transportation <br />corridor. Attachment 5 has been provided for reference only. Shapefiles will be <br />provided to Engineer prior to start of field work. <br />VI. PROPOSED OXBOW-HICKSON-BAKKE LEVEE: Conduct Phase I cultural resources <br />investigations on approximately 1,062 acres of the levee footprint and areas inside <br />the levee, including a pedestrian survey in agricultural fields, borrow areas, levee <br />construction, and a reconnaissance survey along CR-18. Attachment 6 has been <br />provided for reference only. Shapefiles will be provided to Engineer prior to start of <br />field work. <br />VII. STAGING AREA HISTORIC CEMETERIES: Conduct pedestrian surveys and Section 106 <br />compliance reporting for nine (9) historic cemeteries located in Cass and Richland <br />counties, North Dakota, and in Clay and Wilkin counties, Minnesota. U.S. Army <br />Corps of Engineers (USACE) has identified these cemeteries as needing Phase I <br />Cultural Resources survey for the Fargo-Moorhead Metro Flood Risk Management <br />Project (Project). <br />a. Tasks related to the Phase I survey and reporting for the cemeteries <br />include: Field Prep, Mobilization, and Demobilization; Fieldwork, <br />preparation of Site Forms, preparation of Reports, ROE coordination, <br />Agency coordination, and Project Management. <br />URS_TO-01-A03_Long.docx 4 <br />DR <br />A <br />F <br />T