Laserfiche WebLink
<br />Recommended Contracting Actions Summary <br />Date: June 11, 2015 <br />Description Budget Estimate ($) <br />HMG - Task Order No. 13-Amendment 10 <br />Levee Design and Design Support 602,000 <br />• In Town Levees – additional design work, soil characterization, and bid package preparation 0.00 <br />702 Communications – Cost Reimbursement Agreement <br />2nd Street Flood Wall 175,379.73 <br />• Utility Relocation – 2nd Street 0.00 <br />AT&T – Cost Reimbursement Agreement <br />2nd Street Flood Wall 441,330.44 <br />• Utility Relocation – 2nd Street 0.00 <br />Cable One – Cost Reimbursement Agreement <br />2nd Street Flood Wall 148,511.37 <br />• Utility Relocation – 2nd Street 0.00 <br />Enventis Telcom Inc. – Cost Reimbursement Agreement <br />2nd Street Flood Wall 1,324,403 <br />• Utility Relocation – 2nd Street 0.00 <br />Xcel Energy – Cost Reimbursement Agreement 700,000 <br />• Utility Relocation – 2nd Street Floodwall 0.00 <br />Xcel Energy – Cost Reimbursement Agreement 53,641.97 <br />• Utility Relocation – 4th Street High Rise 0.00 <br />Total $3,445,266.51 <br /> <br /> <br />Recommended_Contracting_Actions_Summary_2015-0611.docx 1 <br />DR <br />A <br />F <br />T