06-11-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
06-11-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 12:26:01 PM
Creation date
11/28/2018 2:35:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Recommended Contracting Actions Summary <br />Date: June 11, 2015 <br />Description Budget Estimate ($) <br />HMG - Task Order No. 13-Amendment 10 <br />Levee Design and Design Support 602,000 <br />• In Town Levees – additional design work, soil characterization, and bid package preparation 0.00 <br />702 Communications – Cost Reimbursement Agreement <br />2nd Street Flood Wall 175,379.73 <br />• Utility Relocation – 2nd Street 0.00 <br />AT&T – Cost Reimbursement Agreement <br />2nd Street Flood Wall 441,330.44 <br />• Utility Relocation – 2nd Street 0.00 <br />Cable One – Cost Reimbursement Agreement <br />2nd Street Flood Wall 148,511.37 <br />• Utility Relocation – 2nd Street 0.00 <br />Enventis Telcom Inc. – Cost Reimbursement Agreement <br />2nd Street Flood Wall 1,324,403 <br />• Utility Relocation – 2nd Street 0.00 <br />Xcel Energy – Cost Reimbursement Agreement 700,000 <br />• Utility Relocation – 2nd Street Floodwall 0.00 <br />Xcel Energy – Cost Reimbursement Agreement 53,641.97 <br />• Utility Relocation – 4th Street High Rise 0.00 <br />Total $3,445,266.51 <br /> <br /> <br />Recommended_Contracting_Actions_Summary_2015-0611.docx 1 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.