06-11-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
06-11-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 12:26:01 PM
Creation date
11/28/2018 2:35:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />RECOMMENDED CONTRACTING ACTION DETAIL <br />Houston-Moore Group LLC ADD $ 602,000 <br />Task Order No. 13-Amendment 10 <br />Levee Design and Design Support <br /> <br />Subtask 2.B.i.2.f.: Red River (In Town) Levees <br />Description: <br />Provide geo-probe and soil characterization for Case Plaza parcel. Provide additional design services to <br />subdivide work packages for construction contracts. Provide additional design services to coordinate <br />floodwall design work with City of Fargo project work. <br />Background: <br />The addition of the soil classification work will help identify what portion of excavated soil can be used on <br />the project site. The additional design effort is needed to coordinate floodwall designs with adjacent City of <br />Fargo City Hall and sanitary sewer projects. Additional bid package preparation work is needed to <br />accommodate construction phasing and bidding. <br />Recommendation: <br />PMC recommends approval of Task Order No. 13-Amendment 10 for $602,000. <br /> <br />Recommended_Contracting_Actions_Summary_2015-0611.docx 2 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.