06-11-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
06-11-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 12:26:01 PM
Creation date
11/28/2018 2:35:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />4. Operation and Maintenance Plan – prepare draft <br />O&M Plan for review by the Owner, PMC, and <br />USACE. Incorporate review comments and prepare <br />final O&M Plan. <br />5. Bid Document Development – incorporate 95 <br />percent review comments into the design <br />documents and assist the PMC with development of <br />bid documents. <br />c. Additional design work to accommodate requested project changes: <br />i. None. <br />d. Deliverables: <br />i. Detailed Plans and Specifications <br />ii. 65 Percent Design Submittal <br />iii. 95 Percent Design Submittal <br />iv. 95 Percent Cost Estimate <br />v. Bid Documents <br />vi. Operation and Maintenance Plan <br />ii. Upstream Staging Area Ring Levees: <br />1. Provide support as defined below and as requested in writing. Types of <br />requests may include: <br />a. Respond to information requests by affected residences and develop <br />information for presentations or public meetings. <br />b. Conduct a geotechnical site visit(s) of the levee site(s) to observe <br />surface features and, if requested, conduct subsurface investigations. <br />c. Determine existing utilities and utility relocation requirements. <br />d. Begin conceptual design of the levees and/or floodwalls and <br />floodgates, interior layout (which may include street layout, storm <br />water sewer, storage, and lift station sizing, house relocation planning, <br />and golf course layout), and external infrastructure (road raises for <br />egress). <br />2. Oxbow/Hickson/Bakke – Ring Levee Evaluation: <br />a. Prepare a proposed ring levee system to reduce flood risk to <br />Oxbow/Hickson/Bakke, ND during operation of the Diversion Project <br />and staging of water. Show the location of a potential ring levee, <br />develop height required for rink levee, and evaluate access during <br />periods of Diversion operation. <br />b. The ring levee will impact the golf course and clubhouse. Provide <br />conceptual design services for re-design of the golf course and <br />clubhouse. <br />i. Provide an updated conceptual design of golf course and <br />clubhouse based on update levee alignment to accommodate <br />a total of 80 replacement residential lots. <br />c. Initial Survey and Geotechnical Activities for Levee Design: <br />i. Work with USACE to develop a geotechnical investigation <br />plan for the alternative Levee alignments for approval. <br />HMG-TO-13-A10_Long.docx 9 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.