<br />6. Bid Document Development – incorporate <br />95 percent review comments into the design <br />documents and assist the PMC with development of <br />bid documents. <br />c. Additional design work to accommodate requested project changes: <br />ii. None. <br />d. Deliverables: <br />iii. Detailed Plans and Specifications <br />1. 35 Percent Design Submittal <br />2. 65 Percent Design Submittal <br />3. 95 Percent Design Submittal <br />iv. 65 Percent Cost Estimate <br />v. 95 Percent Cost Estimate <br />vi. Operation and Maintenance Plan <br />6. El Zagal Phase 2 Levee Design <br />a. Background: The El Zagal Phase 2 Levee is a component of In-Town <br />levees that was conceptually evaluated as part of the July 16, 2012 <br />report entitled “Final Technical Memorandum, AWD-00002 – Flows <br />Through Flood Damage Reduction Area” and includes an extension of <br />recently completed El Zagal Phase 1 Levee to the south to tie into high <br />ground. <br />b. Detailed Plans and Specifications: Provide design services and prepare <br />detailed plans as described below. <br />i. Complete detailed project engineering and design and <br />provide plans and technical specifications (Division 2 and <br />higher) for the El Zagal Phase 2 Levee. Include required <br />surveying, removals and demolition, geotechnical and <br />hydraulic analyses, internal flood control and pumping, levee <br />systems, roadway revisions, public and private utility <br />relocations, landscaping, drawings and specifications, internal <br />QA/QC, design documentation, operation and maintenance <br />plan, and project management and coordination. Major <br />milestone deliverables include: <br />1. 65 Percent Design Submittal – advance the detailed <br />design to 65 percent and submit the design report, <br />plans and specifications for review by the Owner, <br />PMC, and USACE Consistency and ATR review teams. <br />2. 95 Percent Design Submittal – evaluate and <br />incorporate 65 percent review comments into the <br />design documents, advance the detailed design to <br />95 percent and submit the design report, plans and <br />specifications for review by the Owner, PMC, and <br />USACE Consistency and ATR review teams. <br />3. Cost Estimate – prepare a cost estimate for the <br />project based on the 95 percent submittal <br />documents. <br />HMG-TO-13-A10_Long.docx 8 <br />DR <br />A <br />F <br />T