06-11-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
06-11-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 12:26:01 PM
Creation date
11/28/2018 2:35:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />1. 35 Percent Design Submittal – prepare preliminary <br />design submittal and submit the design report and <br />preliminary plans for review by the Owner, PMC, and <br />USACE Consistency and ATR review teams. <br />2. 95 Percent Design Submittal – evaluate and <br />incorporate 35 percent review comments into the <br />design documents, advance the detailed design to <br />95 percent and submit the design report, plans and <br />specifications for review by the Owner, PMC, and <br />USACE Consistency and ATR review teams. <br />3. Pre-Purchase Specifications - prepare up to 3 pre- <br />purchase specifications, if requested, for: <br />a. Gates <br />b. Pumps <br />c. Electrical Panels <br />4. Cost Estimate – prepare a cost estimate for the <br />project based on the 35 percent and 95 percent <br />submittal documents. <br />5. Operation and Maintenance Plan – prepare draft <br />O&M Plan for review by the Owner, PMC, and <br />USACE. Incorporate review comments and prepare <br />final O&M Plan. <br />6. Bid Document Development – incorporate 95 <br />percent review comments into the design <br />documents and assist the PMC with development of <br />bid documents. <br />c. Additional design work to accommodate requested project changes: <br />i. Increase capacity of the back-up power generator to <br />accommodate power for adjacent sanitary sewer lift station. <br />ii. Modify the pump station and generator building design <br />including: addition/modification of transoms and lintels, <br />lower pump station slab, deletion of fuel storage, addition of <br />louvers, removal of windows and parapets, and modification <br />of brick veneer. <br />d. Deliverables: <br />i. Detailed Plans and Specifications <br />1. 35 Percent Design Submittal <br />2. 95 Percent Design Submittal <br />ii. Pre-Purchase Specifications <br />iii. 35 Percent Cost Estimate <br />iv. 95 Percent Cost Estimate <br />v. Operation and Maintenance Plan <br />1. Draft Plan <br />2. Final Plan <br />HMG-TO-13-A10_Long.docx 6 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.