Laserfiche WebLink
<br />Houston-Moore Group, LLC (HMG) <br />Task Order No. 8, Amendment 10 Add $ 175,000 <br />Work In Kind <br />Subtask 2.E.VI: MN EIS Preparation Support <br />Description: <br />Provide additional support and analysis for preparation of Socioeconomic report, along with additional <br />support of review of draft MN EIS Sections. <br />Background: <br />Due to complexity of the socioeconomic analysis and higher than anticipated level of effort required to <br />respond to MDNR socioeconomic questions, along with additional review time for other draft MN EIS <br />Sections, additional time is required to complete the work. <br />Cost = $ 150,000 <br />Subtask 2.E.VII: Cemetery Assessment Team Support <br />Descriptions: <br />No cost change: extend period of performance to September 30, 2015. <br />Subtask 2.E.VIII: Large Structure Team Support <br />Descriptions: <br />Provide engineering consultation and design review services for USACE’s Maple River Aqueduct and <br />Diversion Inlet Structure designs. <br />Background: <br />Additional funding needed to provide continued support for these USACE design efforts. <br />Cost = $ 25,000 <br />Subtask 2.E.IX: Hydraulic Structures Aesthetics Evaluation <br />Descriptions: <br />No cost change: extend period of performance to September 30, 2015. <br /> <br />Recommendation: <br />PMC recommends authorization for Task Order No. 8, Amendment 10 for $ 175,000. <br />TASK_ORDER_SUMMARY_2015-0409.DOCX 3 <br />DR <br />A <br />F <br />T