Laserfiche WebLink
<br />TASK ORDER SUMMARY <br />Houston-Moore Group, LLC (HMG) <br />Task Order No. 7, Amendment 3 Add $ 90,000 <br /> Recreation and Use Master Planning and Design <br />Subtask 2.B: Undulating Design <br />Description: <br />Provide undulating berm design for the right bank Excavated Material Berms (EMB) of the Diversion <br />Channel for WP-10B (the Maple River Aqueduct reach) and between the Inlet and Sheyenne River Aqueduct <br />which includes WP-25, WP-26, and WP-28 (USACE Reaches 17 & 18). <br />Background: <br />Design work has started for the Maple River Aqueduct, Diversion Inlet and adjacent CR-16 and CR-17 bridge <br />and roadway realignments. Undulating berms are integral to channel and bridge EMB designs and requires <br />coordination with those design teams. <br />Cost = $ 11,000 <br />Subtask 2.C: Design Support <br />Description: <br />Provide design and consulting services to assist with the incorporation of aesthetic and recreational <br />features into the project design. For WP–43A and WP–43C, coordinate with the City of Oxbow and the <br />Oxbow Golf and Country Club projects. Work with community representatives and project stakeholders to <br />develop relocated Oxbow Park concept. Prepare relocated Oxbow Park bidding documents. <br />Background: <br />New Oxbow Park construction is planned for fall of 2015 so that the relocation of the existing park can be <br />completed in the spring of 2016, prior to planned WP-43C levee construction. <br />Cost = $ 79,000 <br />Recommendation: <br />PMC recommends authorization for Task Order No. 7, Amendment 3 for $ 90,000. <br /> <br />TASK_ORDER_SUMMARY_2015-0409.DOCX 2 <br />DR <br />A <br />F <br />T