Laserfiche WebLink
<br />WP‐42A 2‐00_C‐941 Change Order 02.docx Page 1 of 2  <br /> Change Order No. 02  <br />Date of Issuance: 01/08/2015 Effective Date: 01/08/2015  <br />Owner: Metro Flood Diversion Authority Owner's Contract No.: WP‐42A.2  <br />Owner’s   <br />Representative:  CH2M HILL Engineers, Inc.  <br />Owner’s Representative  <br />Project No.: 435534  <br />Contractor: Industrial Builders, Inc. Contractor’s Project No.:   <br />Engineer: Houston‐Moore Group, LLC Work Package No.: WP‐42A.2  <br />Project: Fargo‐Moorhead Area Diversion Contract Name:  <br />2nd Street/Downtown – In‐Town Levees,  <br />2nd Street N Pump Station, Fargo ND  <br />The Contract is modified as follows upon execution of this Change Order:  <br />Description:  <br />1. Incorporate Work Change Directive 2 into Contract Price by adding line item 0024, Remove  <br />Subsurface Concrete Structure to Unit Price Schedule. Lump Sum price for this line item includes  <br />Time & Material (T&M) work performed in December 2014.  <br />2. Add line item 0025, Hazardous Fill Removal and Disposal – T&M, Not to Exceed to Unit Price  <br />Schedule to accommodate disposal of potentially hazardous fill material from the location of the  <br />differing subsurface condition described in Work Change Directive 2. Disposal to be performed  <br />on a T&M basis not to exceed $60,000 in total price.  <br /> <br />Attachments: <br /> Change Order 2 Unit Price Schedule  <br />  <br />