  <br />HMG‐TO‐13‐A7_Long.docx  3  <br />i. Preliminary Levee Design Structural Design – Develop preliminary  <br />design of levee protection system, preliminary estimate of  <br />embankment and borrow requirements, and prepare a narrative of  <br />design criteria.  <br />j. Preliminary Structural Design – Develop preliminary design for  <br />proposed floodwalls and closures, pump stations, and miscellaneous  <br />drainage structures. Prepare a narrative with descriptions of features,  <br />design considerations, and criteria assumptions.  <br />k. Transportation Evaluation – Develop initial evaluation of  <br />transportation impacts, and participate in two (2) coordination  <br />meetings with City of Fargo staff and two (2) coordination meetings  <br />with railroad staff. Develop up to five (5) alternatives for the 2nd Street  <br />road alignment to accommodate flood protection alternatives.  <br />l. Preliminary Environmental Studies – Complete Phase 1 Environmental  <br />Site Assessment report for six (6) properties.  <br />m. Preliminary Design Report and Drawings – Prepare Preliminary Design  <br />Report (PDR) with cost estimates and preliminary project plans for  <br />selected alignment. Prepare artists renderings of selected plan.  <br />n. Project Management – Document coordination and review, schedule  <br />and resource management, budgeting, and project team coordination.  <br />o. Landscape Architecture/Master Planning‐ Provide landscape  <br />architecture and master planning services for the Red River Levees.   <br />i. Provide landscape architecture services for the 2nd St.  <br />Corridor from NP Ave. to 4th Ave.  Coordinate with the city of  <br />Fargo City Hall Project throughout the design phase of the  <br />City Hall Project.   <br />ii. Provide master planning services from Mickelson to the 4th St.  <br />Levee.   <br />2. Phase 2 – Detailed Plans and Specifications:  Complete detailed project  <br />engineering and design and provide plans and technical specifications  <br />(Division 2 and higher) for the selected alternative from Phase 1.  Include  <br />required surveying, environmental studies, permitting, removals and  <br />demolition, geotechnical and hydraulic analyses, internal flood control and  <br />pumping, levee systems, floodwalls, closures, traffic evaluations, road  <br />realignments and signal changes, public and private utility relocations,  <br />landscaping, drawings and specifications, internal QA/QC, design  <br />documentation, operation and maintenance plan, and project management  <br />and coordination. Major milestone deliverables include:  <br />a. 65 Percent Design Submittal – evaluate and incorporate accepted VE  <br />proposals into the design documents, advance the detailed design to  <br />65 percent and submit the design report, plans and specifications for  <br />review by the Diversion Authority, PMC, USACE Consistency, Agency  <br />Technical Review (ATR) and USACE Independent External Peer Review  <br />(IEPR) review teams.  <br />b. 95 Percent Design Submittal – evaluate and incorporate 65 percent  <br />review comments into the design documents, advance the detailed  <br />design to 95 percent and submit the design report, plans and  <br />DR <br />A <br />F <br />T