    <br />HMG‐TO‐13‐A7_Long.docx  1  <br />This is Task Order No. 13, Amendment 76,  <br />consisting of 17 pages.  <br />Houston‐Moore Group, LLC <br />Task Order No. 13, Amendment 76 <br />Levee Design and Design Support  <br />In accordance with Paragraph 1.01 of the Agreement between Fargo‐Moorhead Flood Diversion Authority  <br />(“Owner”) and Houston‐Moore Group, LLC (HMG) (“Engineer”) for Professional Services – Task Order Edition,  <br />dated March 8, 2012 ("Agreement"), Owner and Engineer agree as follows:  <br />The parties agree that in the event of a conflict between prior versions of this Task Order No. 13 and this  <br />Amendment, the terms and conditions in this Amendment shall prevail, provided however, nothing herein shall  <br />preclude ENGINEER from invoicing for work authorized under prior versions of this Task Order and performed prior  <br />to effective date of this Amendment, even to the extent such prior work was revised by this Amendment. All other  <br />terms and conditions shall remain the same and are hereby ratified and affirmed by the parties.  <br />  <br />1. Specific Project Data  <br />A. Title: Levee Design and Design Support  <br />B. Description: As part of Work‐in‐Kind (WIK), provide assistance to USACE, in design and design  <br />support activities, for design of levees along the Red River to support increased flow through the  <br />protected area and for levees in the upstream staging area. Provide Lands, Easements, Rights‐of‐ <br />Way, Relocations, and Disposal areas (LERRDs) assistance to Owner to support the levee designs.  <br />C. Background:    <br />i. Red River Levees:  At the November 8, 2012 Diversion Board meeting, the Board  <br />requested the US Army Corps of Engineers (USACE) add levees along the Red River to  <br />allow increased flow through the protected area. This task order allows HMG to provide  <br />design and design support to USACE for these Red River levees.  <br />1. Phase 1 – Screening of alternatives and selecting final alignment scope to include:   <br />Development of Alternatives, Public Involvement, Surveying, Geotechnical  <br />Exploration and Testing, Preliminary Geotechnical Analysis, Preliminary Hydrologic  <br />and Hydraulic Analysis, Preliminary Internal Flood Control Analysis, Preliminary  <br />Utility Investigation, Preliminary Levee and Structural Design, Transportation  <br />Evaluation, Preliminary Environmental Studies, Preliminary Report and Drawings,  <br />and Project Management.  <br />2. Phase 2 – Detailed Plans and Specifications:  Based on the alternative selected in  <br />Phase 1, conduct a Value Engineering (VE) evaluation of the proposed project and  <br />prepare plans and specifications for 65 and 95 percent submittals, and prepare a cost  <br />estimate based on the 95 percent design submittal.  Notice To Proceed (NTP) will be  <br />subject to the completion and signing of the USACE Supplemental Environmental  <br />Assessment (EA).  <br />ii. Upstream Staging Area Levees/Ring Dikes: At the November 8, 2012 Diversion Board  <br />meeting, the Board passed AWD‐00020 Recommended Board of Authority Position for  <br />Post‐Feasibility Alternatives Analysis VE‐13A vs. VE‐13C, which authorized HMG to begin  <br />conceptual design and site investigations of potential levees for the Oxbow.  <br />DR <br />A <br />F <br />T