10-09-2014
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2014
>
10-09-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2014 11:42:45 AM
Creation date
11/28/2018 2:35:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
BID OPENING SUMMARY <br /> 2nd Street North Pump Station <br />Work Package 42A.2 <br />September 30, 2014 <br />Bidder Name Contract No. 1 <br />General Construction <br />Contract No. 2 <br />Electrical Construction <br />Contract No. 3 <br />Mechanical Construction <br />Contract No. 4 <br />All Construction Bid <br />B <br />o <br />n <br />d <br />s <br />Con <br />t <br />r <br />a <br />c <br />t <br />o <br />r Li <br />c <br />. <br />Add <br />e <br />n <br />d <br />a <br />Industrial Builders, Inc.7,516,900.00$ -$ -$ 8,069,000.00$ <br />Lakehead Constructors 8,658,759.00$ -$ -$ -$ <br />Wanzek Construction Inc.10,105,300.00$ -$ -$ -$ <br />Moorhead Electric -$ 435,500.00$ -$ -$ <br />Fusion Automation -$ 449,536.00$ -$ -$ <br />Rick Electric -$ 488,300.00$ -$ -$ <br />Fritz Electric -$ 518,064.00$ -$ -$ <br />John T. Jones X X X X
The URL can be used to link to this page
Your browser does not support the video tag.