10-09-2014
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2014
>
10-09-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2014 11:42:45 AM
Creation date
11/28/2018 2:35:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CH2M HILL <br />657 2nd Ave N #5405 <br />Fargo ND 58105-5405 <br />Ph: (701) 566-5470 <br /> <br />October 9, 2014 <br /> <br /> <br />Metro Flood Diversion Authority <br />Attention: Darrell Vanyo, Chairman <br />211 9th Street South, Box 2806 <br />Fargo, ND 58108 <br /> <br />Subject: Work Package 42A.2, 2nd Street North Pump Station <br />Recommendation of Award <br />Dear Board Members: <br />CH2M HILL (Program Management Consultant) recommends the Metro Flood Diversion Authority award <br />Work Package 42.A2, 2nd Street North Pump Station, to Industrial Builders, Inc. (IBI) in the amount of <br />$8,069,000.00 as the lowest and best bid. <br />We conducted a public Bid Opening for this project on September 30, 2014. No contractors responded to <br />the Mechanical Construction (Contract 3) component of the Work Package; therefore, the Basis of Award is <br />the Combined Construction (Contract 4) component. IBI alone provided a bid for Combined Construction. <br />See attached bid opening summary for details. <br />IBI’s bid for Combined Construction is approximately 21% lower than the Engineer’s Opinion of Probable <br />Cost. The bid appears to be complete and consistent with the required work; therefore, we feel it is <br />appropriate for the Board to approve this award. <br />Contact me at 208-771-1686 or tyler.smith@ch2m.com if you have any questions regarding this <br />recommendation. <br />Sincerely, <br /> <br /> <br />Tyler Smith, P.E. <br />Construction Manager <br />CH2M HILL <br />Owner’s Representative <br /> <br />Attachment: Bid Opening Summary <br />Ltr-DivAuth-WP-42A.2-RecommendationOfAward-20141009.docx <br />c: Bruce Spiller/CH2M HILL <br />Keith Berndt/Cass County <br />Heather Worden/Cass County <br />Mark Bittner/City of Fargo <br />April Walker/City of Fargo <br />Gregg Thielman/HMG <br /> <br />479407.B3.33.23.01
The URL can be used to link to this page
Your browser does not support the video tag.